Difference between revisions of "Apr 03 2024"
Jump to navigation
Jump to search
(Created page with "==Updates== * Fabrication ** Received two more cathode front end 16/30 samples from machine shop. These samples will be polished using sandpaper to remove machining marks fro...") |
|||
Line 2: | Line 2: | ||
* Fabrication | * Fabrication | ||
− | ** | + | ** One additional sample electrode 30-60 was received from the shop. This sample was finished up in the shop with 600 grit sandpaper. |
+ | ** Jessica is polishing the sample piece mentioned above plus another sample received earlier. The goal is to have these pieces polished with corncob by the end of the week. | ||
+ | ** Machine shop expect to have the four final electrode pieces done by ~ April 10. (Two option A 16-30 deg pieces, and two of the 16-60 deg option B pieces, all made with vacuum arc re-melt 316 L SS). | ||
+ | ** A 24" long Teflon rod for puck manipulation during gun assembly is being made by the shop, expected to be done by ~ April 5. | ||
+ | * S&A R30-3 gun in LERF clean room | ||
+ | ** Last week the gun was surveyed and a laser launch was established collinear with the gun z-axis. | ||
+ | ** Preliminary checks of laser retro-reflection were made with a mirror puck | ||
+ | ** Work was interrupted by the CEBAF event | ||
==Schedule== | ==Schedule== |
Revision as of 07:36, 3 April 2024
Updates
- Fabrication
- One additional sample electrode 30-60 was received from the shop. This sample was finished up in the shop with 600 grit sandpaper.
- Jessica is polishing the sample piece mentioned above plus another sample received earlier. The goal is to have these pieces polished with corncob by the end of the week.
- Machine shop expect to have the four final electrode pieces done by ~ April 10. (Two option A 16-30 deg pieces, and two of the 16-60 deg option B pieces, all made with vacuum arc re-melt 316 L SS).
- A 24" long Teflon rod for puck manipulation during gun assembly is being made by the shop, expected to be done by ~ April 5.
- S&A R30-3 gun in LERF clean room
- Last week the gun was surveyed and a laser launch was established collinear with the gun z-axis.
- Preliminary checks of laser retro-reflection were made with a mirror puck
- Work was interrupted by the CEBAF event
Schedule
Resources needed
- Labor
- S&A
- Installation