Difference between revisions of "MOLLER PQB Meeting April 10, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' 1- '''Two major MOLLER beam studies in Hall A...")
 
 
Line 17: Line 17:
 
### 4-channel BPMs saturation in West Arc
 
### 4-channel BPMs saturation in West Arc
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 +
 +
 +
2- '''Next week meeting (April 17, 2027) is cancelled'''

Latest revision as of 12:47, 10 April 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Two major MOLLER beam studies in Hall A - Hall A is ON April 12th:

  1. FFB in Hall A: (tentatively scheduled on April 17)
    1. BSList to start Hall A April run with FFB ON [1] and for MOLLER test [2]- Ryan Bodestein
    2. BSList to measure PQB beam in Hall A helicity flip of 2 kHz and to measure monitor (BPMs, BCMs) resolution: [3]
  2. K-Long Beam Loading: (tentatively scheduled on May 1)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [4]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [5]
    3. Other issues to look for:
      1. 4-channel BPMs saturation in West Arc
      2. Dumping beam harmonics right onto one of the higher order mode frequencies


2- Next week meeting (April 17, 2027) is cancelled