Difference between revisions of "MOLLER PQB Meeting May 8, 2024"
Jump to navigation
Jump to search
(5 intermediate revisions by the same user not shown) | |||
Line 14: | Line 14: | ||
### 4-channel BPMs saturation | ### 4-channel BPMs saturation | ||
### Dumping beam harmonics right onto one of the higher order mode frequencies | ### Dumping beam harmonics right onto one of the higher order mode frequencies | ||
− | # '''Check beam power capability May 2024''': | + | ## '''Check beam power capability May 2024''': Benesch - up to 40 μA to Hall A - [https://tasklists.jlab.org/bslist/tasks/111972] |
Latest revision as of 19:04, 10 May 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Feed Forward Status: (tentatively scheduled on May 19) - media:Y.Roblin_FFBHALLA.pdf
- K-Long Beam Loading: (tentatively scheduled on May 19)
- BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [1]
- BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [2]
- Other issues to look for:
- 4-channel BPMs saturation
- Dumping beam harmonics right onto one of the higher order mode frequencies
- Check beam power capability May 2024: Benesch - up to 40 μA to Hall A - [3]