Difference between revisions of "MOLLER PQB Meeting July 10, 2024"
Jump to navigation
Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' * '''Beam Study Results:''' # FFB/FF in Hal...") |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 9: | Line 9: | ||
* '''Beam Study Results:''' | * '''Beam Study Results:''' | ||
− | # FFB/FF in Hall A: | + | # FFB/FF in Hall A: |
## Check S/H wiring of the Hall A BPMs in BSY | ## Check S/H wiring of the Hall A BPMs in BSY | ||
## Check FFB ON versus OFF in QWeak data | ## Check FFB ON versus OFF in QWeak data | ||
+ | ## 2010 QWeak Data: [https://logbooks.jlab.org/search/site/FFB?f%5B0%5D=im_field_logbook%3A133&f%5B1%5D=is_uid%3A219]<br /> | ||
Line 17: | Line 18: | ||
# Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart | # Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart | ||
− | # | + | # Gun replacement will re-start tomorrow |
− | # Four out of six MFX solenoids are | + | # Four out of six MFX solenoids have been fixed, remaining two are planned next week. |
− | * '''MOLLER | + | * '''MOLLER new rack in ISB - IN03B25''': [[media:IMG_1695.jpeg]] |
Latest revision as of 15:52, 10 July 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Beam Study Results:
- FFB/FF in Hall A:
- Check S/H wiring of the Hall A BPMs in BSY
- Check FFB ON versus OFF in QWeak data
- 2010 QWeak Data: [1]
- Injector Upgrade Progress:
- Hazardous Energy Control Lockout/Tagout (HEC LOTO) Pause and Restart
- Gun replacement will re-start tomorrow
- Four out of six MFX solenoids have been fixed, remaining two are planned next week.
- MOLLER new rack in ISB - IN03B25: media:IMG_1695.jpeg