Difference between revisions of "MOLLER PQB Meeting September 11, 2024"

From Ciswikidb
Jump to navigation Jump to search
(5 intermediate revisions by the same user not shown)
Line 11: Line 11:
 
* '''Injector Upgrade Progress:'''  
 
* '''Injector Upgrade Progress:'''  
  
# Gun was conditioned to 200 kV without field emission
+
# Beam tests showed excellent beam quality and good transmission at 100 μA: [https://logbooks.jlab.org/entry/4315868 ELOG #4315868]
# Beam tests showed excellent beam quality and good transmission at 100 uA: yan
 
 
# RTP new HV Driver full system testing started this week
 
# RTP new HV Driver full system testing started this week
  
Line 18: Line 17:
 
* '''Beam Study Results:'''
 
* '''Beam Study Results:'''
  
# FFB/FF in Hall A:
+
# FFB/FF in Hall A: need a plan
## May beam test, FFT and width, Xiang Zhang: [[media:2024May_FFBtest_Results.pdf]]
 
## Check FFB ON versus OFF in QWeak data
 
## 2010 QWeak Data: [https://logbooks.jlab.org/search/site/FFB?f%5B0%5D=im_field_logbook%3A133&f%5B1%5D=is_uid%3A219]<br  />
 

Revision as of 07:38, 11 September 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Upgrade Progress:
  1. Beam tests showed excellent beam quality and good transmission at 100 μA: ELOG #4315868
  2. RTP new HV Driver full system testing started this week


  • Beam Study Results:
  1. FFB/FF in Hall A: need a plan