Difference between revisions of "MOLLER PQB Meeting November 20, 2024"

From Ciswikidb
Jump to navigation Jump to search
 
(11 intermediate revisions by the same user not shown)
Line 9: Line 9:
  
  
* '''Injector Beam Studies:'''
+
* '''Injector Beam Studies:''' two-week delay — now starts Dec 13th
# Schedule - Ken Surles-Law: [[media:Inj 2024 BSList SAD_rev2-Ken.xlsx]]
 
  
  
 +
* '''Fast Feedback Plans:''' first draft — [[media:FastFeedback_Plans.pdf]]
  
* '''JLAB Prototype HV Driver:'''
 
# Installation Schedule: [[media:RTP_Installation_Schedule.pdf]]
 
  
 +
* '''MOLLER AI/ML proposal:''' in collaboration with Halls B/D and David Lawrence as Lead PI
  
  
 
+
* '''Yves Roblin has an AWP for BSY quads re-configuration needed for 11 GeV to Hall A — Yves is leading/tracking this effort.'''
* '''Fast Feedback Plan:''' [[media:FastFeedback_Plans.pdf]]
 
 
 
 
 
 
 
 
 
 
 
* '''MOLLER AI/ML proposal:''' in collaboration with Halls B/D and Lead PI David Lawrence
 

Latest revision as of 08:36, 24 November 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • Injector Beam Studies: two-week delay — now starts Dec 13th



  • MOLLER AI/ML proposal: in collaboration with Halls B/D and David Lawrence as Lead PI


  • Yves Roblin has an AWP for BSY quads re-configuration needed for 11 GeV to Hall A — Yves is leading/tracking this effort.