Difference between revisions of "MOLLER PQB Meeting December 11, 2024"
Jump to navigation
Jump to search
Line 17: | Line 17: | ||
− | * '''Fast Feedback Plans:''' | + | * '''Fast Feedback Plans:''' [[media:FastFeedback_Plans.pdf]] |
Revision as of 10:23, 12 December 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Injector Beam Studies:
- Parasitic Parity DAQ checkout and training to 1D: Saturday December 14th Day and Swing shifts. During this time a photocathode lifetime measurement at 200 µA is scheduled.
- MOLLER DAQ tests to 1D at 65 µA: Sunday December 15th Day and Swing shifts. At this time, MOLLER can change beam current, Helicity Board settings, etc.
- MOLLER Beam Studies: Wien Flip Table — media:PQB_Wien_plans.xlsx
- Fast Feedback Plans: media:FastFeedback_Plans.pdf