Difference between revisions of "Bubble Chamber Beam Test August 2015"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
# Tue, August 11: Turn on gun, commission new lasers, beam to FC1 (Joe Grames). | # Tue, August 11: Turn on gun, commission new lasers, beam to FC1 (Joe Grames). | ||
# Wed, August 12: Beam to FC2 and 5D dump (Yan, Riad). | # Wed, August 12: Beam to FC2 and 5D dump (Yan, Riad). | ||
− | # Thursday, August 13: Check beam optics to 5D (Chris). Measure beam | + | # Thursday, August 13: Check beam optics to 5D (Chris). Measure beam charge (Riad). |
# Friday, August 14: Mott and photocathode Analyzing power (Joe ,Riad). | # Friday, August 14: Mott and photocathode Analyzing power (Joe ,Riad). | ||
# Saturday, August 15: Find maximum energy and measure beam energy (Jay, Riad). | # Saturday, August 15: Find maximum energy and measure beam energy (Jay, Riad). |
Revision as of 06:33, 7 August 2015
Run Plan
This is a test of 5D line, the chamber is off.
- Tue, August 11: Turn on gun, commission new lasers, beam to FC1 (Joe Grames).
- Wed, August 12: Beam to FC2 and 5D dump (Yan, Riad).
- Thursday, August 13: Check beam optics to 5D (Chris). Measure beam charge (Riad).
- Friday, August 14: Mott and photocathode Analyzing power (Joe ,Riad).
- Saturday, August 15: Find maximum energy and measure beam energy (Jay, Riad).