Difference between revisions of "Bubble Chamber Beam Test September 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
= '''Run Plan''' =
 
= '''Run Plan''' =
  
* '''Chamber is filled with natural N2O'''
+
* '''Chamber is filled with natural N<sub>2</sub>O'''
  
  

Revision as of 17:52, 3 September 2015

Run Plan

  • Chamber is filled with natural N2O


  • Cross sections and expected rates:

The expected rates are calculated with 3 cm cell thickness and thin radiator.


  • The cross sections are shown in the following figure:

CrossSections-10MeV.gif

  • The expected rates are shown in the following figure:

GNaturalN2O.gif

  • The expected rates from oxygen isotopes are shown in the following figure:

GNaturalO.gif