Difference between revisions of "Bubble Chamber Beam Test August 2015"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
 
* '''This is a test of 5D line, the chamber is off.'''
 
* '''This is a test of 5D line, the chamber is off.'''
+
 
# Tue, August 11: Turn on gun, commission new lasers, beam to FC1 (Joe Grames).
+
 
# Wed, August 12: Beam to FC2 and 5D dump (Yan, Riad).
+
# Beam Optics to 5D
# Thursday, August 13: Check beam optics to 5D (Chris). Measure beam charge (Riad).
+
 
# Friday, August 14: Mott and photocathode Analyzing power (Joe ,Riad).
+
# Measure beam charge
# Saturday, August 15: Find maximum energy and measure beam energy (Jay, Riad).
+
 
 +
# Maximum 1/4 Cryo-unit gradients
 +
 
 +
# Measure beam energy

Revision as of 14:55, 6 September 2015

Run Plan

  • This is a test of 5D line, the chamber is off.


  1. Beam Optics to 5D
  1. Measure beam charge
  1. Maximum 1/4 Cryo-unit gradients
  1. Measure beam energy