= Run II (9 shifts is Friday DAY through Monday OWL) =
+
==Prep and HCO w/o beam =
# (2.0 shifts) Good knowledge of beam (energy, energy spread, emittance)
 
# (3.5 shifts) Target thickness extrapolation at KE=5.0 MeV
 
# (2.0 shifts) Sensitivity of analyzing power vs. energy about 5.0 MeV
 
# (1.0 shifts) Repeat spot size and possibly energy spread systematic at KE=5.0 MeV
 
# (0.5 shifts) Asymmetry vs. beam intensity
 
 
 
== Prep and HCO w/o beam ==
 
 
# (John) 31 MHz laser -  
 
# (John) 31 MHz laser -  
 
# (Riad) Test laser RF trigger at DAQ
 
# (Riad) Test laser RF trigger at DAQ
Line 14: Line 7:
 
# (Riad/Daniel) Check HV, check DAQ, Analysis, Macros ready for 31 MHz
 
# (Riad/Daniel) Check HV, check DAQ, Analysis, Macros ready for 31 MHz
  
== Pre-Run II Beam Setup and Tests  ==
+
= Pre-Run Beam Setup and Tests  (2 shifts) =
# (Injector Group) Recovery to FC2 @ 6.3 MeV by 10/15
+
# Recovery to FC2 @ 6.3 MeV by 10/15
# (1 shift) Mott beam test - Test 31 MHz synchronization, set L/R/U/D delays, set PMT HV, check PMT response
+
# Mott beam test - Test 31 MHz synchronization, set L/R/U/D delays, set PMT HV, check PMT response
# (1 shift) Beam diagnostics - Test harp, BCM calibration, quick emittance method  
+
# Beam diagnostics - Test harp, BCM calibration, quick emittance method  
  
== Run II Beam and Polarimeter Setup ==
+
== 2.0 shifts - Good knowledge of beam (energy, energy spread, emittance) ==
 
# Set KE=5.0 MeV
 
# Set KE=5.0 MeV
 
# Measure emittance at MQJ0L02
 
# Measure emittance at MQJ0L02
Line 28: Line 21:
 
# Setup spin direction, use Mott for final adjustment
 
# Setup spin direction, use Mott for final adjustment
  
== Target Foil Extrapolation at KE=5.0 MeV ==
+
== (3.5 shifts) Target thickness extrapolation at KE=5.0 MeV ==
 
# Use the 10 foils with 25mm aperture spanning 8 nominal thicknesses (0.05, 0.05, 0.225, 0.35, 0.35, 0.50, 0.625, 0.750, 0.87, 1.0)  
 
# Use the 10 foils with 25mm aperture spanning 8 nominal thicknesses (0.05, 0.05, 0.225, 0.35, 0.35, 0.50, 0.625, 0.750, 0.87, 1.0)  
 
# Interleave 1um gold foils to demonstrate stabiilty
 
# Interleave 1um gold foils to demonstrate stabiilty
 +
 +
== (2.0 shifts) Sensitivity of analyzing power vs. energy about 5.0 MeV ==
 +
 +
== (1.0 shifts) Repeat spot size and possibly energy spread systematic at KE=5.0 MeV ==
 +
 +
== (0.5 shifts) Asymmetry vs. beam intensity ==

Revision as of 06:50, 7 October 2015

=Prep and HCO w/o beam

  1. (John) 31 MHz laser -
  2. (Riad) Test laser RF trigger at DAQ
  3. (Joe) Make a photocathode – SL5247-4 (52471-1 was used for Run I, but it's being removed from Gun2 next week)
  4. (Marcy) Check Mott vacuum, configuration (hipot 3D01 again?)
  5. (Joe) Cycle target ladder, test camera, test magnets, test 2D harp
  6. (Riad/Daniel) Check HV, check DAQ, Analysis, Macros ready for 31 MHz

Pre-Run Beam Setup and Tests (2 shifts)

  1. Recovery to FC2 @ 6.3 MeV by 10/15
  2. Mott beam test - Test 31 MHz synchronization, set L/R/U/D delays, set PMT HV, check PMT response
  3. Beam diagnostics - Test harp, BCM calibration, quick emittance method

2.0 shifts - Good knowledge of beam (energy, energy spread, emittance)

  1. Set KE=5.0 MeV
  2. Measure emittance at MQJ0L02
  3. Measure energy spread at IHA2D00
  4. Verify BCM calibration good
  5. Calibrate PITA IHWP=in/out
  6. Setup beam to Mott, check PMT HV, TOF spectra, set thresholds HI, check instrumental asymmetry
  7. Setup spin direction, use Mott for final adjustment

(3.5 shifts) Target thickness extrapolation at KE=5.0 MeV

  1. Use the 10 foils with 25mm aperture spanning 8 nominal thicknesses (0.05, 0.05, 0.225, 0.35, 0.35, 0.50, 0.625, 0.750, 0.87, 1.0)
  2. Interleave 1um gold foils to demonstrate stabiilty

(2.0 shifts) Sensitivity of analyzing power vs. energy about 5.0 MeV

(1.0 shifts) Repeat spot size and possibly energy spread systematic at KE=5.0 MeV

(0.5 shifts) Asymmetry vs. beam intensity