Difference between revisions of "Bubble Chamber Meeting Wednesday October 7, 2015"
Jump to navigation
Jump to search
Line 39: | Line 39: | ||
### Better light coverage | ### Better light coverage | ||
### Improve cooling capacity | ### Improve cooling capacity | ||
− | ### Introduce a lens to locate camera farther and better shielding of gammas (camera was sensitive to gammas) | + | ### Introduce a lens to locate camera farther and for better shielding of gammas (camera was sensitive to gammas) |
### Improve operational pressure control and regulation | ### Improve operational pressure control and regulation | ||
### Be able to take data from MCC instead of Injector Service Building | ### Be able to take data from MCC instead of Injector Service Building |
Revision as of 13:58, 9 October 2015
We will meet in TL 2221 on Wednesday October 7 at 3:30 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Bubble Chamber removal and shipping back to ANL
2- September beam test summary
Notes from this meeting:
- Bubble Chamber Removal:
- Planned on October 20 and 21
- Crates will be staged by October 19
- Plan to ship every thing back to Argonne
- Shipping arrangement will be made once chamber is crated and ready in north tunnel access building
- Beam Test Summary (Ernst):
- Plus
- Minus
- Events distribution shows a cone instead of a cylinder - why?
- Improvements
- Easy
- Better light coverage
- Improve cooling capacity
- Introduce a lens to locate camera farther and for better shielding of gammas (camera was sensitive to gammas)
- Improve operational pressure control and regulation
- Be able to take data from MCC instead of Injector Service Building
- Tough
- One fluid system - no more mercury
- New collimator in chamber
- Easy
- Beam Energy: