Difference between revisions of "Data Acquisition and Control racks"
Jump to navigation
Jump to search
Back to UITC_technical_areas
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | <center> Back to [[UITC_technical_areas]]</center> | |
− | [[ITF01]] | + | ==Rack number and assigned function== |
+ | |||
+ | [[ITF01]] Dipole Power Supply | ||
[[ITF02]] Magnet trim rack 1 | [[ITF02]] Magnet trim rack 1 | ||
Line 7: | Line 9: | ||
[[ITF03]] Magnet trim rack 2 | [[ITF03]] Magnet trim rack 2 | ||
− | + | [[ITF04]] Instrumentation and Control | |
− | + | ||
+ | [[ITF05]] Cryogenics Controls | ||
+ | |||
+ | [[ITF06]] Cryogenics Controls | ||
+ | |||
+ | [[ITF07]] Network and Communication Systems | ||
+ | |||
+ | [[ITF08]] BPM 1 | ||
+ | |||
+ | [[ITF09]] BPM 2 | ||
+ | |||
+ | [[ITF10]] Viewers | ||
+ | |||
+ | [[ITF11]] Vacuum | ||
+ | |||
+ | [[ITF12]] Insertables | ||
+ | |||
+ | [[ITF13]] Klystron supplies | ||
+ | |||
+ | [[ITF14]] High Power RF | ||
+ | |||
+ | [[ITF15]] Buncher Solid State Amplifier | ||
+ | |||
+ | [[ITF16]] RadCon Controls | ||
+ | |||
+ | [[ITF17]] PSS rack 1 | ||
+ | |||
+ | [[ITF18]] PSS rack 2 | ||
+ | |||
+ | [[ITF19]] Network and Low Level RF | ||
+ | |||
+ | [[ITF20]] Chopper Cavity RF amplifiers | ||
+ | |||
+ | [[ITF21]] Gun High Voltage & Laser Controls | ||
+ | |||
+ | |||
+ | Upper level Electrical Plan, rack power feeds, and panelboard schedules: [[File:ELEC_100-1.pdf]] |
Latest revision as of 10:35, 4 November 2015
Rack number and assigned function
ITF01 Dipole Power Supply
ITF02 Magnet trim rack 1
ITF03 Magnet trim rack 2
ITF04 Instrumentation and Control
ITF05 Cryogenics Controls
ITF06 Cryogenics Controls
ITF07 Network and Communication Systems
ITF08 BPM 1
ITF09 BPM 2
ITF10 Viewers
ITF11 Vacuum
ITF12 Insertables
ITF13 Klystron supplies
ITF14 High Power RF
ITF15 Buncher Solid State Amplifier
ITF16 RadCon Controls
ITF17 PSS rack 1
ITF18 PSS rack 2
ITF19 Network and Low Level RF
ITF20 Chopper Cavity RF amplifiers
ITF21 Gun High Voltage & Laser Controls
Upper level Electrical Plan, rack power feeds, and panelboard schedules: File:ELEC 100-1.pdf