** Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
 
** Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
 
** Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
 
** Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
 +
 +
*Cathode prep chamber
 +
** Matt says the effusion source heater is now in his office
 +
** Bottom heater, Joe says we need about 8 Amps 4-5 VDC for 550C, Shukui will give us one PS.
 +
** For the top heater, (stalk heater) needs to be finished by Phil, we have the SOLO and relay box for driving the heater.
  
 
* Magnet nomenclature
 
* Magnet nomenclature

Latest revision as of 13:56, 5 April 2016

  • To protect the viewer crystal from beam damage:
    • Ask Omar:
    • To look at the GTS drive laser control chassis for DL trigger
    • Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
    • Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
  • Cathode prep chamber
    • Matt says the effusion source heater is now in his office
    • Bottom heater, Joe says we need about 8 Amps 4-5 VDC for 550C, Shukui will give us one PS.
    • For the top heater, (stalk heater) needs to be finished by Phil, we have the SOLO and relay box for driving the heater.
  • Magnet nomenclature