Line 4: | Line 4: | ||
** Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc. | ** Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc. | ||
** Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room. | ** Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room. | ||
+ | |||
+ | *Cathode prep chamber | ||
+ | ** Matt says the effusion source heater is now in his office | ||
+ | ** Bottom heater, Joe says we need about 8 Amps 4-5 VDC for 550C, Shukui will give us one PS. | ||
+ | ** For the top heater, (stalk heater) needs to be finished by Phil, we have the SOLO and relay box for driving the heater. | ||
* Magnet nomenclature | * Magnet nomenclature |
Latest revision as of 13:56, 5 April 2016
- To protect the viewer crystal from beam damage:
- Ask Omar:
- To look at the GTS drive laser control chassis for DL trigger
- Is there a line-sync module? it is a logic level to trigger things like laser, cameras, etc.
- Carlos to talk to Omar for viewer cameras and BNC cabling to monitors in the GTS control room.
- Cathode prep chamber
- Matt says the effusion source heater is now in his office
- Bottom heater, Joe says we need about 8 Amps 4-5 VDC for 550C, Shukui will give us one PS.
- For the top heater, (stalk heater) needs to be finished by Phil, we have the SOLO and relay box for driving the heater.
- Magnet nomenclature