Difference between revisions of "GTS meeting 5 31 16"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
** [https://logbooks.jlab.org/entry/3407216 300keV DC beam 1.6 uA on the Dump] | ** [https://logbooks.jlab.org/entry/3407216 300keV DC beam 1.6 uA on the Dump] | ||
** [[File:GTS 1p6 uA 300keV beam at Dump.jpg]] | ** [[File:GTS 1p6 uA 300keV beam at Dump.jpg]] | ||
+ | ** And yes...with the multi-alkali photocathode the current has increased to 1.7 uA after one hr of running beam. | ||
+ | ** [[File:GTS 1p7 uA 300keV beam at dump..after running for 1 hr.jpg]] | ||
** The laser variable attenuator is not working, so we started to steer beam through the viewers, but seems the beam is too intense. | ** The laser variable attenuator is not working, so we started to steer beam through the viewers, but seems the beam is too intense. | ||
** Yan steered the beam to the dump, which reportes 1.6 micro-Amps! This made the vacuum increase from 1E-11 Amps, to about 1E-6 Amps when the beam was at each viewer. | ** Yan steered the beam to the dump, which reportes 1.6 micro-Amps! This made the vacuum increase from 1E-11 Amps, to about 1E-6 Amps when the beam was at each viewer. | ||
** Shukui has a plan to have full control of the laser output power and variable attenuator. It involves setting up a PC in the GTS, and a new ThorLabs variable attenuator wheel. | ** Shukui has a plan to have full control of the laser output power and variable attenuator. It involves setting up a PC in the GTS, and a new ThorLabs variable attenuator wheel. | ||
− | ** William Lu | + | ** William Lu and Keith Cole are working on getting the beam dump Kethley signal to EPICS |
** First we ran at 275kV, then at 300kV, stable! | ** First we ran at 275kV, then at 300kV, stable! | ||
− | |||
** Oh! The electricians wired up a GTS enclosure light switch! it works! | ** Oh! The electricians wired up a GTS enclosure light switch! it works! | ||
− | * What do we do next! | + | * What do we do next!? |
+ | ** RadCon requested more 300kV beam time Wednesday afternoon around 2:30 pm. We will need about the same amount of laser power to deliver ~1.6 uA of beam! | ||
** Yan points out that emittance measurements will be very difficult, if not impossible, because the solenoid is not counter wound. | ** Yan points out that emittance measurements will be very difficult, if not impossible, because the solenoid is not counter wound. | ||
− | ** | + | ** Due to the cathode electrode misalignment, the Haimson coils are not strong enough to center (H) the beam on the solenoid. |
** Align beam on solenoids, perhaps need to physical adjust the first solenoid mount. | ** Align beam on solenoids, perhaps need to physical adjust the first solenoid mount. | ||
** Need to write a beam measurements and cathode lifetime studies plan. | ** Need to write a beam measurements and cathode lifetime studies plan. | ||
+ | ** Want a camera on top viewport to look at laser spot on the cathode | ||
* Before going to higher beam current, Need to short out the conditioning resistor. | * Before going to higher beam current, Need to short out the conditioning resistor. |
Latest revision as of 13:00, 31 May 2016
- We ran beam for RadCon Surveys
- 300keV DC beam 1.6 uA on the Dump
- And yes...with the multi-alkali photocathode the current has increased to 1.7 uA after one hr of running beam.
- The laser variable attenuator is not working, so we started to steer beam through the viewers, but seems the beam is too intense.
- Yan steered the beam to the dump, which reportes 1.6 micro-Amps! This made the vacuum increase from 1E-11 Amps, to about 1E-6 Amps when the beam was at each viewer.
- Shukui has a plan to have full control of the laser output power and variable attenuator. It involves setting up a PC in the GTS, and a new ThorLabs variable attenuator wheel.
- William Lu and Keith Cole are working on getting the beam dump Kethley signal to EPICS
- First we ran at 275kV, then at 300kV, stable!
- Oh! The electricians wired up a GTS enclosure light switch! it works!
- What do we do next!?
- RadCon requested more 300kV beam time Wednesday afternoon around 2:30 pm. We will need about the same amount of laser power to deliver ~1.6 uA of beam!
- Yan points out that emittance measurements will be very difficult, if not impossible, because the solenoid is not counter wound.
- Due to the cathode electrode misalignment, the Haimson coils are not strong enough to center (H) the beam on the solenoid.
- Align beam on solenoids, perhaps need to physical adjust the first solenoid mount.
- Need to write a beam measurements and cathode lifetime studies plan.
- Want a camera on top viewport to look at laser spot on the cathode
- Before going to higher beam current, Need to short out the conditioning resistor.
- At 1 micro-Amps beam current, the voltage drop on the cathode is already 0.3 kV, at 100 micro-Amps it will be 30 kV!!! because the resistor is 300 Mega-Ohms.
- We should let Shukui take the time to give us full control of the laser power and attenuator.
- What else?....