Difference between revisions of "PQB Meeting July 21, 2016"

From Ciswikidb
Jump to navigation Jump to search
Line 20: Line 20:
 
'''Notes from this meeting:'''
 
'''Notes from this meeting:'''
  
* Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed by June 22, 2016. These include BPM Pedestals calibration, PITS scan, RHWP scan, PC x and y stages scan, and laser phase scan on Chopper.
+
* Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, PC x and y stages scan, and laser phase scan on Chopper.
  
* Are we going to move Pre-Buncher upstream on VWien before PREx-II? [[media:Wien_screen.jpeg]]
+
* Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?
 +
 
 +
[[file:Wien_screen.jpeg.jpg|right|300px|]]

Revision as of 07:53, 13 June 2016

We will meet in TL 2236 Thursday July 21 at 1:00 pm EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Results from PQB beam tests in Injector

2- Halo Monitor plans in Hall A




Notes from this meeting:

  • Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, PC x and y stages scan, and laser phase scan on Chopper.
  • Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?