Difference between revisions of "PQB Meeting July 21, 2016"
Jump to navigation
Jump to search
Line 20: | Line 20: | ||
'''Notes from this meeting:''' | '''Notes from this meeting:''' | ||
− | * Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed | + | * Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, PC x and y stages scan, and laser phase scan on Chopper. |
− | * Are we going to move Pre-Buncher upstream | + | * Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II? |
+ | |||
+ | [[file:Wien_screen.jpeg.jpg|right|300px|]] |
Revision as of 07:53, 13 June 2016
We will meet in TL 2236 Thursday July 21 at 1:00 pm EST.
For those calling in we'll use the Blue Jeans [1] audio conference system.
Phone number: 1-888-240-2560 Meeting ID: 3528502673# Meeting URL: http://bluejeans.com/3528502673
Agenda:
1- Results from PQB beam tests in Injector
2- Halo Monitor plans in Hall A
Notes from this meeting:
- Ciprian will submit 5 ATLises for beam tests to Inline dump in Injector to be performed before Summer Shutdown (June 22, 2016). These include BPM Pedestals calibration, PITS scan, RHWP scan, PC x and y stages scan, and laser phase scan on Chopper.
- Are we going to move Pre-Buncher upstream of Vertical Wien before PREx-II?