Difference between revisions of "October 9, 2013"

From Ciswikidb
Jump to navigation Jump to search
Line 15: Line 15:
  
 
;Tunnel work updates and plans (yes, includes target selection).
 
;Tunnel work updates and plans (yes, includes target selection).
* Bad IP replaced, both IP's on now
+
* Vacuum work
* As-founds of existing dump plate taken.  ME working, but slowly
+
** Bad IP replaced, both IP's on now
 +
** As-founds of existing dump plate taken.  ME working, but slowly
 +
* Target Ladder
 +
* New controller surveyed
 
* EEL-118 Inventory [[Media:MeV_Mott_Foils.pdf]]
 
* EEL-118 Inventory [[Media:MeV_Mott_Foils.pdf]]
 
* 500keV Mott Inventory: 0.01; 0.03; 0.07; 0.1; 1.0 (mount type?)
 
* 500keV Mott Inventory: 0.01; 0.03; 0.07; 0.1; 1.0 (mount type?)

Revision as of 13:37, 9 October 2013

Mott Team Meeting

We will meet in TED 2561B on Wednesday October 9 at 3pm EST.

For those calling in we'll use the ReadyTalk audio conference system.

1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada)
2. Enter 7-digit access code 3441852, followed by “#”

Agenda

Update on commissioning schedule.
  • November 9 - Start ACC-I
  • November 14 - (2 shifts) Mott commission 12am-4pm
  • December 20 - End of ACC-I
Tunnel work updates and plans (yes, includes target selection).
  • Vacuum work
    • Bad IP replaced, both IP's on now
    • As-founds of existing dump plate taken. ME working, but slowly
  • Target Ladder
  • New controller surveyed
  • EEL-118 Inventory Media:MeV_Mott_Foils.pdf
  • 500keV Mott Inventory: 0.01; 0.03; 0.07; 0.1; 1.0 (mount type?)
Marty tells Matt why Monte Carlo (Geant) is important.
Tim tells us about Nobel gas polarimetry