Difference between revisions of "Talk:GTS meeting 6 27 16"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 4: | Line 4: | ||
*3. Increase laser spot size to 4 mm | *3. Increase laser spot size to 4 mm | ||
*4. Make a brand new photocathode (there is one puck with bare GaAs in the prep chamber) using the mask. | *4. Make a brand new photocathode (there is one puck with bare GaAs in the prep chamber) using the mask. | ||
+ | * For future, Joe G. recommends to do a high temp (450) beam dump bakeout. | ||
+ | |||
+ | * And also: | ||
+ | ** QE scanner, Dennis Turner working on software, Shukui and Adriana to setup laser scanner beam alignment | ||
+ | ** We need full EPICS control of the laser....some day |
Latest revision as of 10:37, 27 June 2016
- Things to try next, in order:
- 1. Run with the beam viewers shields completely out for improved pumping speed,
- 2. Bias anode positive, John hsa PS
- 3. Increase laser spot size to 4 mm
- 4. Make a brand new photocathode (there is one puck with bare GaAs in the prep chamber) using the mask.
- For future, Joe G. recommends to do a high temp (450) beam dump bakeout.
- And also:
- QE scanner, Dennis Turner working on software, Shukui and Adriana to setup laser scanner beam alignment
- We need full EPICS control of the laser....some day