Difference between revisions of "GTS meeting 11 08 16"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "* EES support at GTS: # SCAM # Upgrade crossings with 3-position controls")
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
* Beamline Drawings:
 +
:[[file:GTS_Beamline_11-8-16_Front_View.jpg]]
 +
 +
 +
:[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]]
 +
 +
 +
* New Beamline Magnets:
 +
# Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
 +
 +
 
* EES support at GTS:
 
* EES support at GTS:
# SCAM  
+
# SCAM module installation
# Upgrade crossings with 3-position controls
+
# Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
 +
# Instrument Faraday Cup
 +
 
 +
 
 +
* Procurement:
 +
# Two radiabeam steerers
 +
# Steerers mounts
 +
# What else?

Latest revision as of 16:08, 15 November 2016

  • Beamline Drawings:
GTS Beamline 11-8-16 Front View.jpg


media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf


  • New Beamline Magnets:
  1. Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)


  • EES support at GTS:
  1. SCAM module installation
  2. Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
  3. Instrument Faraday Cup


  • Procurement:
  1. Two radiabeam steerers
  2. Steerers mounts
  3. What else?