Difference between revisions of "GTS meeting 11 08 16"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | * | + | * Beamline Drawings: |
− | + | :[[file:GTS_Beamline_11-8-16_Front_View.jpg]] | |
− | + | ||
− | + | ||
+ | :[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]] | ||
* New Beamline Magnets: | * New Beamline Magnets: | ||
# Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total) | # Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total) | ||
+ | |||
+ | |||
+ | * EES support at GTS: | ||
+ | # SCAM module installation | ||
+ | # Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty) | ||
+ | # Instrument Faraday Cup | ||
Latest revision as of 16:08, 15 November 2016
- Beamline Drawings:
- New Beamline Magnets:
- Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
- EES support at GTS:
- SCAM module installation
- Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
- Instrument Faraday Cup
- Procurement:
- Two radiabeam steerers
- Steerers mounts
- What else?