* EES support at GTS:
 
* EES support at GTS:
 
# SCAM module installation
 
# SCAM module installation
# Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty)
+
# Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
 
# Instrument Faraday Cup
 
# Instrument Faraday Cup
  

Latest revision as of 16:08, 15 November 2016

  • Beamline Drawings:
GTS Beamline 11-8-16 Front View.jpg


media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf


  • New Beamline Magnets:
  1. Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)


  • EES support at GTS:
  1. SCAM module installation
  2. Upgrade the two diagnostic crossings with 3-position controls (viewer, slit, empty)
  3. Instrument Faraday Cup


  • Procurement:
  1. Two radiabeam steerers
  2. Steerers mounts
  3. What else?