Difference between revisions of "GTS meeting 8 28 17"
Jump to navigation
Jump to search
(Created page with "* Emittance Measurements - Yan * New plan: # Finish emittance measurements, including a larger laser size (x3) – August 21-25 # Attempt 5 mA (non-magnetized, then magnetiz...") |
|||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | * Emittance Measurements - Yan | + | * Emittance Measurements with large laser size (rms=0.423mm) - Yan: [https://logbooks/entry/3482539] |
* New plan: | * New plan: | ||
− | # Finish emittance measurements, including a larger laser size ( | + | # Finish emittance measurements, including a larger laser size (x4) – August 21-25 |
# Attempt 5 mA (non-magnetized, then magnetized) – August 28-31 | # Attempt 5 mA (non-magnetized, then magnetized) – August 28-31 | ||
# Shutdown – September 5: | # Shutdown – September 5: | ||
## Install new YAG screen at viewer 3 | ## Install new YAG screen at viewer 3 | ||
## Fix existing harp and install 20 µm tungsten wire | ## Fix existing harp and install 20 µm tungsten wire | ||
− | ## Add a new CEBAF-style harp with 10 µm tungsten wire | + | ## Add a new CEBAF-style harp with 10 µm tungsten wire (''i.e'', GTS will have two harps) |
+ | ## Replace leaky vent valve | ||
+ | ## Replace bad ion pump | ||
+ | # Next Shutdown – December 2017: | ||
+ | ## Install TE011 cavity |
Latest revision as of 09:18, 28 August 2017
- Emittance Measurements with large laser size (rms=0.423mm) - Yan: [1]
- New plan:
- Finish emittance measurements, including a larger laser size (x4) – August 21-25
- Attempt 5 mA (non-magnetized, then magnetized) – August 28-31
- Shutdown – September 5:
- Install new YAG screen at viewer 3
- Fix existing harp and install 20 µm tungsten wire
- Add a new CEBAF-style harp with 10 µm tungsten wire (i.e, GTS will have two harps)
- Replace leaky vent valve
- Replace bad ion pump
- Next Shutdown – December 2017:
- Install TE011 cavity