(Created page with "=== Mott Team Meeting === We will meet next on Wednesday Dec 4 at 3pm EST locally in TL-2236 (2nd floor conference above room we met last time) or call in by ReadyTalk details b...") |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Mott Team Meeting === | === Mott Team Meeting === | ||
− | We will meet next on Wednesday Dec 4 at 3pm EST locally in TL-2236 (2nd floor conference above room we met last time) or call in by ReadyTalk details below. | + | We will meet next on Wednesday Dec 4 at 3pm EST locally in TL-2236 (2nd floor conference nearly above room we met last time) or call in by ReadyTalk details below. |
== For those calling in we'll use the ReadyTalk audio conference system. == | == For those calling in we'll use the ReadyTalk audio conference system. == | ||
Line 7: | Line 7: | ||
2. Enter 7-digit access code 3441852, followed by “#” | 2. Enter 7-digit access code 3441852, followed by “#” | ||
− | == | + | == Commissioning Plan == |
− | ; Review commissioning plan (will circulate | + | ; (All) Review commissioning plan (will circulate something on Tuesday) |
− | ; Dump plate | + | * Word [[Media:MottCommissioning.docx]] |
− | ; | + | * PDF[[Media:MottCommissioning.pdf]] |
+ | ; (Joe) Schedule | ||
+ | |||
+ | == Dump plate == | ||
+ | ; (Marty) Power deposition simulation | ||
+ | ; (Joe) Parts time line | ||
+ | |||
+ | == January meeting at JLAB == | ||
+ | ; (Allena) theorist availability | ||
+ | ; (All) List of our questions |
Latest revision as of 11:45, 4 December 2013
Mott Team Meeting
We will meet next on Wednesday Dec 4 at 3pm EST locally in TL-2236 (2nd floor conference nearly above room we met last time) or call in by ReadyTalk details below.
For those calling in we'll use the ReadyTalk audio conference system.
1. Dial Toll-Free Number: 866-740-1260 (U.S. & Canada) 2. Enter 7-digit access code 3441852, followed by “#”
Commissioning Plan
- (All) Review commissioning plan (will circulate something on Tuesday)
- (Joe) Schedule
Dump plate
- (Marty) Power deposition simulation
- (Joe) Parts time line
January meeting at JLAB
- (Allena) theorist availability
- (All) List of our questions