Difference between revisions of "GTS meeting 2 18 19"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
* Re-install Viewer 3 camera | * Re-install Viewer 3 camera | ||
* Calibrate Viewers | * Calibrate Viewers | ||
− | * Install laser seed and pre-amp '''''(frequency = | + | * Install laser seed and pre-amp '''''(frequency = 500.000 MHz, 0 dBm)''''' |
− | * Turn on | + | * Turn on DQWR Deflecting cavity |
Line 11: | Line 11: | ||
* Check Harp | * Check Harp | ||
* Check QW Deflecting cavity | * Check QW Deflecting cavity | ||
− | * Measure bunch length with | + | * Measure bunch length with QWDR cavity |
* Check 1-D pepper-pot | * Check 1-D pepper-pot | ||
Line 18: | Line 18: | ||
* Measure beam emittance with Harp | * Measure beam emittance with Harp | ||
* Measure beam emittance with 1-D pepper-pot | * Measure beam emittance with 1-D pepper-pot | ||
− | * Measure bunch length with | + | * Measure bunch length with QWDR cavity |
Latest revision as of 10:20, 4 March 2019
No Beam Tasks
- Re-install Viewer 3 camera
- Calibrate Viewers
- Install laser seed and pre-amp (frequency = 500.000 MHz, 0 dBm)
- Turn on DQWR Deflecting cavity
Commissioning at 125 kV with VL Beam and 90-min Sb on GaAs substrate
- Check viewers
- Check magnets
- Check Harp
- Check QW Deflecting cavity
- Measure bunch length with QWDR cavity
- Check 1-D pepper-pot
Commissioning at 125 kV with Tune Beam
- Measure beam emittance with Harp
- Measure beam emittance with 1-D pepper-pot
- Measure bunch length with QWDR cavity
Commissioning at 125 kV with CW Beam
- Deliver 100 uA to dump
- Check TE011 cavity signal