Difference between revisions of "GTS meeting 3 11 19"

From Ciswikidb
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
  
  
* Re-tuned DQWR cavity  
+
* Re-tuned DQWR cavity by rotating power-in coupler (broke vacuum)
  
  
Line 14: Line 14:
 
# Commission TE011 cavity
 
# Commission TE011 cavity
 
# Radiation Surveys at 1 mA
 
# Radiation Surveys at 1 mA
# Measure Drift Emittance at 100, 200 and 300 kV and laser rms = 0.9 mm
+
# Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm
 
# Ghost beam studies with P-Gun - List of experiments [[Ghost Beam Studies | here]]
 
# Ghost beam studies with P-Gun - List of experiments [[Ghost Beam Studies | here]]

Latest revision as of 11:17, 11 March 2019

  • Laser frequency is at 499.20025 MHz


  • Shorted out HV power supply conditioning resistor


  • Re-tuned DQWR cavity by rotating power-in coupler (broke vacuum)


  • List of things to do:
  1. RadCon Group to check for x-rays from DQWR cavity
  2. Calibrate new DQWR RF power supply up to 500 W
  3. Measure bunch length using new RF supply
  4. Commission TE011 cavity
  5. Radiation Surveys at 1 mA
  6. Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm
  7. Ghost beam studies with P-Gun - List of experiments here