− | * | + | * '''Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019''' |
Line 5: | Line 5: | ||
# Calibrate new DQWR RF power supply up to 500 W | # Calibrate new DQWR RF power supply up to 500 W | ||
# Measure bunch length using new RF supply | # Measure bunch length using new RF supply | ||
+ | # Transverse beam emittance measurement with 1D pepper-pot | ||
# Commission TE011 cavity | # Commission TE011 cavity | ||
# Radiation Surveys at 1 mA | # Radiation Surveys at 1 mA | ||
# Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm | # Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm | ||
# Ghost beam studies with P-Gun | # Ghost beam studies with P-Gun | ||
− | |||
− | |||
− |
Latest revision as of 06:30, 20 March 2019
- Laser 10 W Fiber Amp will be moved to Hall A Compton on April 8, 2019
- List of things to do:
- Calibrate new DQWR RF power supply up to 500 W
- Measure bunch length using new RF supply
- Transverse beam emittance measurement with 1D pepper-pot
- Commission TE011 cavity
- Radiation Surveys at 1 mA
- Measure Drift Emittance at 200 and 300 kV and laser rms = 0.9 mm
- Ghost beam studies with P-Gun