Difference between revisions of "UITF Safety Documents"
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | HDIce target loading procedure OSP [[media:HDIce target loading OSP.pdf]] | ||
+ | |||
+ | HDIce Dump Magnet OSP [[media:HDIce Dump Magnet OSP.pdf]] | ||
+ | |||
+ | UITF cave 2 catwalk engineering calculations [[media:catwalk engineering calculations from Tom Renzo.pdf]] | ||
+ | |||
UITF Cave2 ceiling roof tile removal, OSP and THA, revision 2, in review [[media:UITF Cave2 ceiling roof tile removal OSP.pdf]]**** [[media:UITF Cave2 ceiling roof tile removal THA.pdf]] | UITF Cave2 ceiling roof tile removal, OSP and THA, revision 2, in review [[media:UITF Cave2 ceiling roof tile removal OSP.pdf]]**** [[media:UITF Cave2 ceiling roof tile removal THA.pdf]] | ||
− | Shielding Design Package from Vashek, approved by SCMB | + | Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, [[media:UITF shielding package by Vashek Vylet.pdf]], Photos of trench foam and lead shielding [[media:UITF trench shielding with photos.xls]] |
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP [[File:Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf]] | Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP [[File:Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf]] | ||
Line 15: | Line 21: | ||
UITF QCM Vacuum Vessel assessment: [[File:QCM Vacuum Vessel Assessment by Gary Cheng.docx]] | UITF QCM Vacuum Vessel assessment: [[File:QCM Vacuum Vessel Assessment by Gary Cheng.docx]] | ||
− | UITF Laser OSP: [[File: | + | UITF Laser OSP (updated 2/24/2020): [[File:ACC-20-97400-LOSP.pdf]] |
UITF keV Beam Operations OSP (note this is revision3 of previously approved OSP): [[File:OSP_UITF keV beam operations_approved revision3.docx]] **** [[File:OSP_UITF keV beam operations_approved revision3.pdf]] **** [[File:OSP-UITF keV beam operations_approved revision3_approved OSP format with signatures.pdf]] | UITF keV Beam Operations OSP (note this is revision3 of previously approved OSP): [[File:OSP_UITF keV beam operations_approved revision3.docx]] **** [[File:OSP_UITF keV beam operations_approved revision3.pdf]] **** [[File:OSP-UITF keV beam operations_approved revision3_approved OSP format with signatures.pdf]] | ||
Line 21: | Line 27: | ||
UITF keV Beam Operations THA (note this is revision3 of previously approved THA): [[File:THA_UITF keV beam operations_approved revision3.pdf]] | UITF keV Beam Operations THA (note this is revision3 of previously approved THA): [[File:THA_UITF keV beam operations_approved revision3.pdf]] | ||
− | UITF sweep procedure, updated | + | UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 [[File: UITF sweep procedure_SSG-PR-03-101_Rev. 20.0_January 3, 2020.pdf]] |
UITF Final Approved ODH Assessment: [[File:UITF ODH Assessment.pdf]] and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit | UITF Final Approved ODH Assessment: [[File:UITF ODH Assessment.pdf]] and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit |
Latest revision as of 14:40, 24 February 2020
HDIce target loading procedure OSP media:HDIce target loading OSP.pdf
HDIce Dump Magnet OSP media:HDIce Dump Magnet OSP.pdf
UITF cave 2 catwalk engineering calculations media:catwalk engineering calculations from Tom Renzo.pdf
UITF Cave2 ceiling roof tile removal, OSP and THA, revision 2, in review media:UITF Cave2 ceiling roof tile removal OSP.pdf**** media:UITF Cave2 ceiling roof tile removal THA.pdf
Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, media:UITF shielding package by Vashek Vylet.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP File:Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF ENP-18-80380-OSP.pdf
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility: Revised OSP #82655 File:Revised OSP 82655 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf and File:Revised THA for 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility.pdf. These files can be accessed at https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?ENTRY_ID=82655
UITF Commissioning the QCM with RF, no beam acceleration, revision2: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424 File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.pdf****File:OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF) revision 2.docx
UITF Commissioning the QCM with RF, no beam acceleration, Task Hazard Analysis, revision2: File:THA for the OSP 82424 QCM Operation at the Upgraded Injector Test Facility (UITF)revision2.pdf
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)
UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx
UITF Laser OSP (updated 2/24/2020): File:ACC-20-97400-LOSP.pdf
UITF keV Beam Operations OSP (note this is revision3 of previously approved OSP): File:OSP UITF keV beam operations approved revision3.docx **** File:OSP UITF keV beam operations approved revision3.pdf **** File:OSP-UITF keV beam operations approved revision3 approved OSP format with signatures.pdf
UITF keV Beam Operations THA (note this is revision3 of previously approved THA): File:THA UITF keV beam operations approved revision3.pdf
UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf
UITF Final Approved ODH Assessment: File:UITF ODH Assessment.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/74180/edit
UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf
UITF TOSP_high voltage conditioning a new photogun with 225kV Spellman supply: File:UITF TOSP gun HV conditioning.pdf **** File:UITF THA gun HV conditioning.pdf