(Created page with "*Update: **HVPS cable wasn't grounded. It is now, but PSS Still trips. **Issues performing sweep due to PSS configuration error **Cathode grid possibly gone. Need to replace c...") |
|||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
*Update: | *Update: | ||
− | ** | + | ** Replaced thermionic cathode |
− | ** | + | ** Added leak valve on mini-flange |
− | ** | + | ** Started Kr processing |
− | + | ||
*Talking Points: | *Talking Points: | ||
− | ** | + | ** Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again) |
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 08:59, 26 August 2019
- Update:
- Replaced thermionic cathode
- Added leak valve on mini-flange
- Started Kr processing
- Talking Points:
- Equipment damage during HV processing: Radiation gamma probe (again), Cathode Solenoid LCW flowmeter chassis (again)