== (1) Get GTS back to operational ==
 +
 
 +
To Fix List (to get GTS running):
 +
 
 +
* Glassman PSS Chassis (Service request to Omar - Carlos)
 +
* LCW Chassis (Sarin/ Mike Todd - follow up)
 +
* Turbo (Replacement part for display - Bubba/Fay)
 +
* Spellman (Augistine/ Riad)
 +
* Picoammeter x2? (Pete Francis in hand - sent for fix)
 +
 
 +
To Check:
 +
* Viewers (Operation - and cameras) (Viewer software - contact Brian Freeman)(??IOC reset?? Tony Delacruz)
 +
* Magnets (IOC check)
 +
* Harp (electronics)
 +
* Cavities (electronics)
 +
* Cathode solenoid - power supply
 +
 
 +
== (2) T-Gun Upgrades ==
 +
 
 +
Need a safe gun - no devastating trips.
 +
'''Limit voltage to 135kV'''
 +
 
 +
RF cage - Features:
 +
* HV attaches through the back as designed.
 +
* G10 plate to support the HV cable
 +
* Nitrogen flow, also through G10 plate aimed at the back of the hot deck
 +
* Nitrogen flow, though the top of the cage, aimed at ceramic
 +
* Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)
 +
 
 +
To Fix/Modify:
 +
* DC bias supply - set point fix (John Musson)
 +
* RF Cage (Mark/Fay)
 +
* Back plate to allow increased cooling (open the hole)
 +
* Move Xelera spellman to the GTS vault
 +
* Software issues (contact Spellman again)
 +
* Install new fiber link & check
 +
 
 +
== (3) ==
 +
Housekeeping:
 +
* Remove RXX cables from GTS
 +
* Remove JLab spellman
 +
* Sort out the air and nitrogen lines.
 +
* Buy a shop vac (ask Bubba)

Latest revision as of 07:26, 23 September 2019

(1) Get GTS back to operational

To Fix List (to get GTS running):

  • Glassman PSS Chassis (Service request to Omar - Carlos)
  • LCW Chassis (Sarin/ Mike Todd - follow up)
  • Turbo (Replacement part for display - Bubba/Fay)
  • Spellman (Augistine/ Riad)
  • Picoammeter x2? (Pete Francis in hand - sent for fix)

To Check:

  • Viewers (Operation - and cameras) (Viewer software - contact Brian Freeman)(??IOC reset?? Tony Delacruz)
  • Magnets (IOC check)
  • Harp (electronics)
  • Cavities (electronics)
  • Cathode solenoid - power supply

(2) T-Gun Upgrades

Need a safe gun - no devastating trips. Limit voltage to 135kV

RF cage - Features:

  • HV attaches through the back as designed.
  • G10 plate to support the HV cable
  • Nitrogen flow, also through G10 plate aimed at the back of the hot deck
  • Nitrogen flow, though the top of the cage, aimed at ceramic
  • Dimensions need to be longer than the table to keep E fields on the hot deck lower than 3MV/m (air breakdown)

To Fix/Modify:

  • DC bias supply - set point fix (John Musson)
  • RF Cage (Mark/Fay)
  • Back plate to allow increased cooling (open the hole)
  • Move Xelera spellman to the GTS vault
  • Software issues (contact Spellman again)
  • Install new fiber link & check

(3)

Housekeeping:

  • Remove RXX cables from GTS
  • Remove JLab spellman
  • Sort out the air and nitrogen lines.
  • Buy a shop vac (ask Bubba)