Difference between revisions of "March 3, 2020 - Modeling"
Jump to navigation
Jump to search
(2 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
;Elegant simulations | ;Elegant simulations | ||
+ | Need to provide desired quad strengths/currents to Jay, see if the existing QU's satisfy this, need to fabricate to have on hand June | ||
;FG magnet spacing | ;FG magnet spacing | ||
Line 10: | Line 11: | ||
;Injector alignment | ;Injector alignment | ||
From: C. Curtis => I have included the e-mail thread where the offsets were discussed. These are 1.2mm in X and 1.5mm in Z. The discontinuity occurs between the QJ0L02 and QJ0L03 girders. Since we will need to re-align the new components upstream of the Chopper anyway, I would propose re-aligning the remaining elements upstream of QJ0L03 such that they are compatible with the rest of the accelerator. | From: C. Curtis => I have included the e-mail thread where the offsets were discussed. These are 1.2mm in X and 1.5mm in Z. The discontinuity occurs between the QJ0L02 and QJ0L03 girders. Since we will need to re-align the new components upstream of the Chopper anyway, I would propose re-aligning the remaining elements upstream of QJ0L03 such that they are compatible with the rest of the accelerator. | ||
− | + | ||
+ | ;PSS kicker | ||
+ | Meeting later this week with Jerry and Lakshmi on boosting kicker strength | ||
;Any other status updates | ;Any other status updates |
Latest revision as of 14:15, 3 March 2020
Agenda
- GPT simulations
- Elegant simulations
Need to provide desired quad strengths/currents to Jay, see if the existing QU's satisfy this, need to fabricate to have on hand June
- FG magnet spacing
/group/inj_group/Field_Maps/Solenoids/FG
- Injector alignment
From: C. Curtis => I have included the e-mail thread where the offsets were discussed. These are 1.2mm in X and 1.5mm in Z. The discontinuity occurs between the QJ0L02 and QJ0L03 girders. Since we will need to re-align the new components upstream of the Chopper anyway, I would propose re-aligning the remaining elements upstream of QJ0L03 such that they are compatible with the rest of the accelerator.
- PSS kicker
Meeting later this week with Jerry and Lakshmi on boosting kicker strength
- Any other status updates