This area is related to Injector Upgrade Meetings
+
The Injector Upgrade begins here.
  
==Injector upgrade calendar==
+
== Phase 1 & 2 portal==
:: Run (now - May 6)
+
* [[Phase 1]]
:: Phase 1 (May 6 - end of 2020)
+
* Phase 1b (R30 with short focusing cathode) SAD 2023
:: Run (Jan 2021 - Sep 13 2021)
+
* Phase 1c (R30 16/30 electrode) SAD 2024
:: Phase 2 (Sep 13 - end of 2021)
+
* [[Phase 2]]
 
 
=== [[Injector Upgrade Meetings]] ===
 
 
 
=== [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABpR9qdRQQGacUVwrDGi9DEw?e=Gb8Y85 Link to AIPINJ OneDrive folder] ===
 
 
 
=== [[AIPINJ Layouts]] ===
 
 
 
=== [[Injector Upgrade Documents and Links]] ===
 
 
 
== Components ==
 
::[[200KV 15 deg dipole]]
 
::[[200KV gun BPM's]]
 
::[[200kV Wien Filter]]
 
::[[Injector Solenoids Upgrade]]
 
::[[200kV Quadrupoles]]
 
::[[200kV PSS Kicker]]
 
::[[200kV Prebuncher]]
 
::[[200kV Choppers]]
 
::[[Vacuum Upgrades]]
 
 
 
==ATLIS Tasks==
 
=== AIPINJ ===
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
 
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 Accelerator network re-survey]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 
=== Non-AIPINJ ===
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 

Latest revision as of 08:40, 18 April 2024

The Injector Upgrade begins here.

Phase 1 & 2 portal

  • Phase 1
  • Phase 1b (R30 with short focusing cathode) SAD 2023
  • Phase 1c (R30 16/30 electrode) SAD 2024
  • Phase 2