Difference between revisions of "CEBAF Injector Upgrade"

From Ciswikidb
Jump to navigation Jump to search
 
(64 intermediate revisions by 3 users not shown)
Line 1: Line 1:
The Injector Upgrade wiki begins here.
+
The Injector Upgrade begins here.
  
==Quick Links==
+
== Phase 1 & 2 portal==
* Daily 8:00am + Wed 1:30 MCC => https://bluejeans.com/569476853
+
* [[Phase 1]]
* Daily 8:30am toolbox => https://bluejeans.com/171126028
+
* Phase 1b (R30 with short focusing cathode) SAD 2023
* Monday 1330 SAD Scheduling Meeting =>  https://bluejeans.com/569476853
+
* Phase 1c (R30 16/30 electrode) SAD 2024
* Schedule - ''updated Nov 10, 2020'' [[media:201110_AIPINJ_Schedule.pdf]]
+
* [[Phase 2]]
 
 
==Planning, planning, planning...==
 
: [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 Phase 1 Planning ATLIS]
 
: [[CIS Phase 1 work plans]]
 
: [[AIPINJ - Layouts]]
 
: [[AIPINJ - S&A Transmittals]]
 
: [[AIPINJ - Upgrade Meetings]]
 
: [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABbL3OnBkCCHeIvb8PQE3aZw?e=vpc8ZM 3D cad and released drawings on AIPINJ OneDrive Folder]
 
: Long term planning - [[AIPINJ - Phase 1 and 2 Schedule]]
 
 
 
==CED related links==
 
* CED nomenclature doc : https://accweb.acc.jlab.org/cnm/codes/system
 
* CED lookup translator : https://accweb.acc.jlab.org/cnm/translator
 
* FINAL CED LIST (9/14/20-checked DM/JG/AH/MS) - [[media:200914_AIPINJ_CED.xlsx]]
 
 
 
== Major Phase 1 Beamline Components ==
 
:[[200 kV gun]] - Cathode, anode and high voltage system
 
:[[200 kV NEG Coated BPM's]] - New BPM's on beam pipe, NEG coated and absolutely mapped
 
:[[Y-chamber Laser Window]] - Evaluating the best window to minimize birefringence under stress
 
:[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole
 
:[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
 
:[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker of reliable design to operate at 200 kV with shorter throw
 
:[[WF Wien Filters (200 kV upgrade)]] - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
 
:[[QW Wien quadrupoles (200 kV upgrade)]] - New quads designed for 200 keV energy, w/ improved magnetic field quality
 
:[[Chopping System (200 kV upgrade)]] - Choppers get higher power amplifiers, maybe a new chopping chamber
 
:[[Pre-buncher cavity (200 kV upgrade)]] - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
 
:[[NEG coated 2.5 inch OD BPM's]] - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
 
:[[HD steering coils]] - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
 
:[[A1/A2 Aperture Steering Cubes]] - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
 
:[[Injector upgrade vacuum improvements]] - Improvements in the vacuum design, use of getter and ion pumps
 
:[[LLRF 3.0 Phase 1]]
 
 
 
== Major Phase 2 Beamline Components ==
 
:[[SRF Booster]]
 
 
 
==ATLIS Tasks==
 
 
 
;AIPINJ
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
 
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
 
 
 
;CIS SAD Tasks
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 
* [https://logbooks.jlab.org/entry/3844689 Fix IHWP readback during SAD]
 
 
 
;Injector Related SAD Tasks
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21431 Install and Commission Wien filter Power Supplies]] (magnet PS)
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21242 Apply labels to I&C components during 2020 SAD]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21020 Neutron Detector System Installation (SAD 2020)]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20644 UHV Power Supply Replacement (ISB)]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]
 
 
 
== [[Injector Upgrade Documents and Links]] ==
 

Latest revision as of 08:40, 18 April 2024

The Injector Upgrade begins here.

Phase 1 & 2 portal

  • Phase 1
  • Phase 1b (R30 with short focusing cathode) SAD 2023
  • Phase 1c (R30 16/30 electrode) SAD 2024
  • Phase 2