Difference between revisions of "GTS meeting 2 02 21"
Jump to navigation
Jump to search
(20 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | * Glassman Gun PSS interlock chassis | + | * Upgrade Glassman Gun PSS interlock chassis (Carlos) |
+ | * Add vacuum interlock to HV supply (Scott) | ||
− | * Beamline | + | * Beamline - no bake of beamline: (Mamun and Bubba) |
+ | ** Replace YAG screens on Viewers 1,2 and 3 | ||
+ | ** Replace leaky right-angle valve | ||
+ | ** Remove Deflecting Cavity and move TE_011 Cavity in its place | ||
− | * Prep Chamber: | + | * Prep Chamber: (Mamun)- '''''Completed''''' [https://logbooks.jlab.org/entry/3869663] |
− | ** | + | ** Fix Transverse Manipulator |
− | ** Add | + | ** Fix Sb boat |
+ | ** Clean Sb pellets off chamber | ||
+ | ** Clean/check Bottom Heater | ||
+ | ** Add Cs for Robust Photocathode research | ||
+ | ** Clean/replace windows | ||
+ | ** Add pucks with Moly and GaAs (Robust Photocathode) substrates | ||
− | * Gun HV Chamber: | + | * Gun HV Chamber: (Carlos) |
+ | ** Clean anode, cathode front | ||
** Replace Anode | ** Replace Anode | ||
** Replace Pierce geometry | ** Replace Pierce geometry | ||
+ | ** Upgrade anode HV bias feed-through to 10 kV | ||
− | * Laser: | + | * Laser: (Shukui) |
+ | ** Re-install 500 MHz green fiber laser | ||
+ | ** Install new pulse laser |
Latest revision as of 09:47, 12 April 2021
- Upgrade Glassman Gun PSS interlock chassis (Carlos)
- Add vacuum interlock to HV supply (Scott)
- Beamline - no bake of beamline: (Mamun and Bubba)
- Replace YAG screens on Viewers 1,2 and 3
- Replace leaky right-angle valve
- Remove Deflecting Cavity and move TE_011 Cavity in its place
- Prep Chamber: (Mamun)- Completed [1]
- Fix Transverse Manipulator
- Fix Sb boat
- Clean Sb pellets off chamber
- Clean/check Bottom Heater
- Add Cs for Robust Photocathode research
- Clean/replace windows
- Add pucks with Moly and GaAs (Robust Photocathode) substrates
- Gun HV Chamber: (Carlos)
- Clean anode, cathode front
- Replace Anode
- Replace Pierce geometry
- Upgrade anode HV bias feed-through to 10 kV
- Laser: (Shukui)
- Re-install 500 MHz green fiber laser
- Install new pulse laser