== Agenda == | == Agenda == | ||
− | < | + | ==== <u>Schedule</u> ==== |
+ | Rough timetable: | ||
+ | # Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.) | ||
+ | # ERR: Feb. 15 | ||
+ | # HDIce run2b ~(March 1-7) | ||
+ | # CMTF tests with C75-1 (mid-March - early-June). Gigi: CMTF schedule / testing duration | ||
+ | # UITF beamline Modification in parallel to install new beamline | ||
+ | # Supplementary Shielding Installation: Early/Mid-June | ||
+ | # Beamline Commissioning / Test Plans / Shielding Verification: Late June / Early July | ||
+ | # First commissioning of water irradiation beamline in ~July/August | ||
+ | |||
+ | ==== <u>New items for discussion:</u> ==== | ||
+ | * ERR Status (Mike) | ||
+ | * HDIce run2b update (Matt) | ||
+ | * Drawings / Schematics (Cameron) | ||
+ | * Shielding update (Mike/Matt) | ||
+ | * Optics Characterization | ||
+ | * Engineering Reports | ||
+ | * Other business | ||
+ | |||
+ | ==== <u>Reports on Open Action Items:</u> ==== | ||
− | |||
[[Meeting_minutes | Back to Main Meeting Minutes Page]] | [[Meeting_minutes | Back to Main Meeting Minutes Page]] |
Latest revision as of 08:56, 10 February 2021
Meeting Information
The meeting will be on
Connecting
To connect to the meeting, please do the following:Wednesday February 10, 2020 at 9:00 AM EST.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/946721076.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 946721076.
- To join via phone, use one of the following numbers and the Conference ID: 946721076.
- Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
Agenda
Schedule
Rough timetable:
- Until CMTF testing: UITF will be locked up daily to improve the rf performance of the booster, measure optics, learn how to beta-match across the booster, etc. (Jan./Feb.)
- ERR: Feb. 15
- HDIce run2b ~(March 1-7)
- CMTF tests with C75-1 (mid-March - early-June). Gigi: CMTF schedule / testing duration
- UITF beamline Modification in parallel to install new beamline
- Supplementary Shielding Installation: Early/Mid-June
- Beamline Commissioning / Test Plans / Shielding Verification: Late June / Early July
- First commissioning of water irradiation beamline in ~July/August
New items for discussion:
- ERR Status (Mike)
- HDIce run2b update (Matt)
- Drawings / Schematics (Cameron)
- Shielding update (Mike/Matt)
- Optics Characterization
- Engineering Reports
- Other business