Difference between revisions of "Meeting 2/3/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
*First installation
+
==First installation==
** remove ~4' pipe in straight passthrough
+
* remove ~4' pipe in straight passthrough
** add reducer + ceramic break + bubble radiator
+
* add reducer + ceramic break + bubble radiator
** add MIT bates magnet + Mott detector on the support table
+
* add MIT bates magnet + Mott detector on the support table
** realistic time frame for DAQ
+
* realistic time frame for DAQ
  
* Second installation
+
==Second installation==
** Replace MIT magnet with Lakshmi's magnet
+
* Replace MIT magnet with Lakshmi's magnet
** Replace Mott detector with Eric's detector
+
* Replace Mott detector with Eric's detector
  
 
==Updates & Discussion==
 
==Updates & Discussion==
 +
* Fabricate (2) 6mm Cu radiators
 +
* Geant4 model for Greg
 +
* Detector  specs/status
 +
* Magnet design/scope

Latest revision as of 15:14, 2 February 2022

First installation

  • remove ~4' pipe in straight passthrough
  • add reducer + ceramic break + bubble radiator
  • add MIT bates magnet + Mott detector on the support table
  • realistic time frame for DAQ

Second installation

  • Replace MIT magnet with Lakshmi's magnet
  • Replace Mott detector with Eric's detector

Updates & Discussion

  • Fabricate (2) 6mm Cu radiators
  • Geant4 model for Greg
  • Detector specs/status
  • Magnet design/scope