Difference between revisions of "Document-Controlled Procedures and Assessments for UITF"

From Ciswikidb
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020:  https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104   
 
HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020:  https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104   
  
UITF Cave2 ceiling roof tile removal, valid through 7/2/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=87551
+
UITF Cave2 ceiling roof tile removal, renewed and updated 7/12/2022: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=135951
  
 
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380
 
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380
Line 15: Line 15:
 
UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424
 
UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424
  
keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/9/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82217
+
keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/1/2026: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=148151
  
 
Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): [[media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx]]
 
Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): [[media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx]]
  
UITF Laser Systems LOSP, valid through 1/24/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=97400
+
UITF Laser Systems LOSP, valid through 1/1/2026 : https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=147881
  
  
 
'''[[Other official documents managed via document-control, e.g., official assessments]]'''
 
'''[[Other official documents managed via document-control, e.g., official assessments]]'''
 +
 +
UITF RWP, https://www.jlab.org/esh/radcon/operations/RWPs
  
 
UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330
 
UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330

Latest revision as of 11:58, 1 February 2023

OSPs, TOSPs and LOSPs for UITF

these procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm

Transferring (loading/removing) targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834

HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104

UITF Cave2 ceiling roof tile removal, renewed and updated 7/12/2022: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=135951

Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380

UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility, valid through 2/20/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82655

UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424

keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/1/2026: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=148151

Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx

UITF Laser Systems LOSP, valid through 1/1/2026 : https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=147881


Other official documents managed via document-control, e.g., official assessments

UITF RWP, https://www.jlab.org/esh/radcon/operations/RWPs

UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330

UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf

Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls

UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)

UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx

UITF Approved ODH Assessment_revision2: File:UITF ODH Assessment revision2.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/112851/attachment/13530/ODH_UITF-Rev2%20-WO%20Edits_final.pdf

UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf

Trim Card Diagnostic and Replacement Procedure File:Trim Card Replacement Procedure ACC-PR-01-004 Rev 7.pdf