Difference between revisions of "Document-Controlled Procedures and Assessments for UITF"
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104 | HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104 | ||
− | UITF Cave2 ceiling roof tile removal, | + | UITF Cave2 ceiling roof tile removal, renewed and updated 7/12/2022: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=135951 |
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380 | Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380 | ||
Line 15: | Line 15: | ||
UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424 | UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424 | ||
− | keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/ | + | keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/1/2026: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=148151 |
Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): [[media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx]] | Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): [[media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx]] | ||
− | UITF Laser Systems LOSP, valid through 1/ | + | UITF Laser Systems LOSP, valid through 1/1/2026 : https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=147881 |
'''[[Other official documents managed via document-control, e.g., official assessments]]''' | '''[[Other official documents managed via document-control, e.g., official assessments]]''' | ||
+ | |||
+ | UITF RWP, https://www.jlab.org/esh/radcon/operations/RWPs | ||
UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330 | UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330 |
Latest revision as of 11:58, 1 February 2023
OSPs, TOSPs and LOSPs for UITF
these procedures are managed via document control with links to individual procedures as shown below, but these documents can also be found using the search tool at this link: https://mis.jlab.org/mis/apps/mis_forms/search_operational_safety_procedure_forms.cfm
Transferring (loading/removing) targets to/from the HDice IBC in cave-2 of the UITF, valid through 3/11/2023: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=94834
HDIce Dump Solenoid – Operating Magnet to Full Field, valid through 10/20/2020: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=95104
UITF Cave2 ceiling roof tile removal, renewed and updated 7/12/2022: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=135951
Cool and Operate HDice IBC and its superconducting magnets in cave2 of UITF, valid through 10/27/2021: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=80380
UITF 748.5 MHz Buncher Cavity Operation at the Upgraded Injector Test Facility, valid through 2/20/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82655
UITF Commissioning the QCM with RF, no beam acceleration, valid through 2/13/2022: https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=82424
keV beam line of the Upgraded Injector Test Facility (UITF), valid through 2/1/2026: https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=148151
Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply (TOSP, not found via search tool, was not submitted I guess but could be useful someday so I save it here): media: Gun High Voltage Conditioning at Upgraded Injector Test Facility (UITF) with Spellman High Voltage Power Supply.docx
UITF Laser Systems LOSP, valid through 1/1/2026 : https://misportal.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=147881
Other official documents managed via document-control, e.g., official assessments
UITF RWP, https://www.jlab.org/esh/radcon/operations/RWPs
UITF Start Up Procedure, approved on 8/24/2020, saved to Docushare; https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-48330
UITF sweep procedure, updated 1/3/2020, Document Number:SSG-PR-03-101,Rev. 20.0 File:UITF sweep procedure SSG-PR-03-101 Rev. 20.0 January 3, 2020.pdf
Shielding Design Package from Vashek, approved by SCMB: https://jlabdoc.jlab.org/docushare/dsweb/Get/Document-200615/JLAB-TN-18-020.pdf, Photos of trench foam and lead shielding media:UITF trench shielding with photos.xls
UITF SF6 tank pressure vessel assessment PS-ACC-17-001 can be found in DOCUSHARE at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38867 (Note, the pressure vessel assessment for a similar SF6 tank used at CEBAF can be found at https://jlabdoc.jlab.org/docushare/dsweb/View/Collection-38417)
UITF QCM Vacuum Vessel assessment: File:QCM Vacuum Vessel Assessment by Gary Cheng.docx
UITF Approved ODH Assessment_revision2: File:UITF ODH Assessment revision2.pdf and available at https://misportal.jlab.org/railsForms/oxygen_deficiency_reviews/112851/attachment/13530/ODH_UITF-Rev2%20-WO%20Edits_final.pdf
UITF Industrial Hygiene Assessment for SF6 exposure: File:UITF SF6 assessment.pdf
Trim Card Diagnostic and Replacement Procedure File:Trim Card Replacement Procedure ACC-PR-01-004 Rev 7.pdf