July 5 | July 5 | ||
− | ; NA-PAC | + | ; NA-PAC - https://attend.ieee.org/napac-2022/ |
* Travel ready? | * Travel ready? | ||
* Proceedings due Aug 2 (4 weeks) | * Proceedings due Aug 2 (4 weeks) | ||
Line 15: | Line 15: | ||
* Riad on-call - Wien SCE 60 Hz ~10% intensity after apertures, Tom says causes RF issues - https://logbooks.jlab.org/entry/4011183 | * Riad on-call - Wien SCE 60 Hz ~10% intensity after apertures, Tom says causes RF issues - https://logbooks.jlab.org/entry/4011183 | ||
* Gun2 lifetime getting better - https://logbooks.jlab.org/entry/4011198 | * Gun2 lifetime getting better - https://logbooks.jlab.org/entry/4011198 | ||
+ | * I&C could not reproduce John's firmware for 4-laser board, assigned engineer use modern comm tools, maybe have to re-write firmware TBD | ||
+ | * Riad working with I&C and fast electronics => Moller helicity board (Riad), new helicity decoder board (Riad), helicity magnets upgrade (Joe), RTP helicity HV driver (Shukui) | ||
; UITF | ; UITF | ||
+ | * this week (Jul 4th) => see if we can wrap up cave work, back to beam permit? [[media:220705_UITF_HCO.docx]] | ||
+ | * next week (Jul 11th) => MeV HCO in AM, then beam for main jobs (beam FC, viewer shields, Wien E/B cal, beam Mott dump, Mott det/DAQ, prebuncher) | ||
+ | * following 2 weeks (July 18 - Aug 1) => MeV beam ops (prebuncher, booster, wastewater) | ||
; Your Projects | ; Your Projects | ||
+ | * Gabriel 500 kV insulator | ||
+ | * Marcy mini-Mott | ||
+ | * Mamun TE011 cavity & vacuum work | ||
+ | * Riad LDRD | ||
+ | * Shukui KL laser |
Latest revision as of 10:36, 5 July 2022
July 5
- NA-PAC - https://attend.ieee.org/napac-2022/
- Travel ready?
- Proceedings due Aug 2 (4 weeks)
- https://wiki.jlab.org/ciswiki/index.php/CIS_Conference_and_Workshop_Proceedings
- Papers and reports
- Valeria's - summer study report
- Matt's PV - graphics from Joe Wien, Marcy Molflow, Riad PV
- Sajini's and Mamun's and Riad's magnetized beams - peer review
- Josh's and Joe's biased anode - author review
- CEBAF and 200 KV gun
- Riad on-call - Wien SCE 60 Hz ~10% intensity after apertures, Tom says causes RF issues - https://logbooks.jlab.org/entry/4011183
- Gun2 lifetime getting better - https://logbooks.jlab.org/entry/4011198
- I&C could not reproduce John's firmware for 4-laser board, assigned engineer use modern comm tools, maybe have to re-write firmware TBD
- Riad working with I&C and fast electronics => Moller helicity board (Riad), new helicity decoder board (Riad), helicity magnets upgrade (Joe), RTP helicity HV driver (Shukui)
- UITF
- this week (Jul 4th) => see if we can wrap up cave work, back to beam permit? media:220705_UITF_HCO.docx
- next week (Jul 11th) => MeV HCO in AM, then beam for main jobs (beam FC, viewer shields, Wien E/B cal, beam Mott dump, Mott det/DAQ, prebuncher)
- following 2 weeks (July 18 - Aug 1) => MeV beam ops (prebuncher, booster, wastewater)
- Your Projects
- Gabriel 500 kV insulator
- Marcy mini-Mott
- Mamun TE011 cavity & vacuum work
- Riad LDRD