===Action Items===
 +
* Gary - extend spool and support two locations, relocate table further downstream, layout modifications for lead wall with hole, check stand status at mech. shop
 +
* Sandesh/Probir - follow-up with EMC re-making coil, tally list of jobs once magnet on-site
 +
* Joe - coordinate cable pulls with Nick and Nate, 20A/120VAC circuit in mech. room with FML, order spool flanges
 +
* Chris - complete rack assembly for UITF, order triax connectors
 +
* Bryan - work with Gary for soft ioc and Brad to activate network port
 +
* Greg - compute integrated asymmetry, simulate 5 configurations, use slurm to run jobs on farm
 +
* Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies
  
 
===Documentation===
 
===Documentation===
 
* NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* NIM - Elsevier Article (elsarticle) template => https://www.overleaf.com/project/62bc9efe48a3a93aef37be0a
 
* Manual - Sharepoint
 
* Manual - Sharepoint

Latest revision as of 18:28, 18 August 2022

Thursday's @ 9am EDT by Zoom

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

  • Gary - extend spool and support two locations, relocate table further downstream, layout modifications for lead wall with hole, check stand status at mech. shop
  • Sandesh/Probir - follow-up with EMC re-making coil, tally list of jobs once magnet on-site
  • Joe - coordinate cable pulls with Nick and Nate, 20A/120VAC circuit in mech. room with FML, order spool flanges
  • Chris - complete rack assembly for UITF, order triax connectors
  • Bryan - work with Gary for soft ioc and Brad to activate network port
  • Greg - compute integrated asymmetry, simulate 5 configurations, use slurm to run jobs on farm
  • Riad - coordinate with Bryan/Hai for 4 usec integration testing, implement for Mott, forward detector studies