Difference between revisions of "PPB - June 7, 2023"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "== Meeting Coordinates ==<br />* On-site => Wednesdays @ 11am EDT in TL-2236 ==== Agenda ==== ; Reports :-Andriy - status of recent jobs :-Joe - status of proposals...")
 
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Meeting Coordinates ==<br  />* On-site => Wednesdays @ 11am EDT in TL-2236
+
=== Meeting Coordinates ===
  
 +
;Wednesdays @ 11am EDT
 +
: -On-site TL-2236
 +
:- Zoom (see e-mail)
  
==== Agenda ====
+
=== Agenda ===
  
 +
;Upcoming meetings...
 +
: - June 14 (10:30-Noon), PWG joint meeting - https://indico.jlab.org/event/719/
 +
: - June 28 (11am) Joe Gubeli, Gallium target at LERF, Ce+BAF weekly meeting
 +
: - June 28 (2-4pm) - Joe or Yves, 'Positron Source and Beam' @ JLUO (15m) - https://www.jlab.org/jluo2023
 +
: - Sep 24 – 29 - Joe, 'A positron beam at CEBAF” @ SPIN'2023 - https://indico.jlab.org/event/663/
  
; Reports
+
;Reports
 +
: -Andriy - CST benchmarking
 +
: -Sohaib - target stress simulations
 +
: -Amy - degrader LDRD plan
  
 +
;Status of proposals
 +
: - HEP proposal for e-/e+ sources development, with SLAC and KEK
 +
: - DOE early career proposal for low vacuum (high current sources)
 +
: - UVA JSA proposal to evaluate spin rotator for higher MeV energies
 +
: - LDRD award (2nd year) to study phase acceptance of CEBAF
 +
: - LDRD proposal (1st year) to study thermal predictions and stresses
 +
: - DOE SBIR awarded to Xelera/JLab for liquid jet target Phase I study
  
:-Andriy - status of recent jobs
+
;2023 topics
 
+
: - Delivering 60-120 MeV e- or e+ from LERF to CEBAF
 
+
: - Quads with large bore and large range 60-600 MeV
:-Joe - status of proposals
+
: - Reversing polarity of magnets w/ bulk PS
 
+
: -Evaluating CEBAF unipolar magnets w/ reversal
 
+
: -Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams
:-Sohaib - describe project
+
: -Evaluation of radiation shielding for >100 kW target
 
+
: -Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams
 
+
: -[[media:JLab AAC Report March 8-10 2023 Final.pdf]]
* Upcoming meetings...
 
 
 
 
 
:- June 28 Joe Gubeli, Gallium target at LERF, Ce+BAF weekly meeting
 
 
 
 
 
:- June 28 (2-4pm) - Joe, 'Positron Source and Beam' @ JLUO (15m) - [https://www.jlab.org/jluo2023 https://www.jlab.org/jluo2023]
 
 
 
 
 
:- Sep 24 – 29 - Joe, 'A positron beam at CEBAF” @ SPIN'2023 - <a href="https://indico.jlab.org/event/663/">https://indico.jlab.org/event/663/</a>
 
 
 
 
 
:- Upcoming topics...
 
 
 
 
 
::* Delivering 60-120 MeV e- or e+ from LERF to CEBAF<br  />::* Quads with large bore and large range 60-600 MeV<br  />::* Reversing polarity of magnets w/ bulk PS<br  />::* Evaluating CEBAF unipolar magnets w/ reversal<br  />::* Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams<br  />::* Evaluation of radiation shielding for >100 kW target<br  />::* Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams<br  />::* [[media:JLab AAC Report March 8-10 2023 Final.pdf]]
 

Latest revision as of 17:10, 6 June 2023

Meeting Coordinates

Wednesdays @ 11am EDT
-On-site TL-2236
- Zoom (see e-mail)

Agenda

Upcoming meetings...
- June 14 (10:30-Noon), PWG joint meeting - https://indico.jlab.org/event/719/
- June 28 (11am) Joe Gubeli, Gallium target at LERF, Ce+BAF weekly meeting
- June 28 (2-4pm) - Joe or Yves, 'Positron Source and Beam' @ JLUO (15m) - https://www.jlab.org/jluo2023
- Sep 24 – 29 - Joe, 'A positron beam at CEBAF” @ SPIN'2023 - https://indico.jlab.org/event/663/
Reports
-Andriy - CST benchmarking
-Sohaib - target stress simulations
-Amy - degrader LDRD plan
Status of proposals
- HEP proposal for e-/e+ sources development, with SLAC and KEK
- DOE early career proposal for low vacuum (high current sources)
- UVA JSA proposal to evaluate spin rotator for higher MeV energies
- LDRD award (2nd year) to study phase acceptance of CEBAF
- LDRD proposal (1st year) to study thermal predictions and stresses
- DOE SBIR awarded to Xelera/JLab for liquid jet target Phase I study
2023 topics
- Delivering 60-120 MeV e- or e+ from LERF to CEBAF
- Quads with large bore and large range 60-600 MeV
- Reversing polarity of magnets w/ bulk PS
-Evaluating CEBAF unipolar magnets w/ reversal
-Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams
-Evaluation of radiation shielding for >100 kW target
-Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams
-media:JLab AAC Report March 8-10 2023 Final.pdf