Difference between revisions of "PPB - June 7, 2023"
Jump to navigation
Jump to search
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | == Meeting Coordinates == | + | === Meeting Coordinates === |
− | + | ;Wednesdays @ 11am EDT | |
− | ; | + | : -On-site TL-2236 |
− | :- | + | :- Zoom (see e-mail) |
− | |||
− | :- | ||
− | + | === Agenda === | |
− | |||
− | |||
− | |||
− | |||
− | ; 2023 topics | + | ;Upcoming meetings... |
− | :- Delivering 60-120 MeV e- or e+ from LERF to CEBAF | + | : - June 14 (10:30-Noon), PWG joint meeting - https://indico.jlab.org/event/719/ |
− | :- Quads with large bore and large range 60-600 MeV | + | : - June 28 (11am) Joe Gubeli, Gallium target at LERF, Ce+BAF weekly meeting |
− | :- Reversing polarity of magnets w/ bulk PS | + | : - June 28 (2-4pm) - Joe or Yves, 'Positron Source and Beam' @ JLUO (15m) - https://www.jlab.org/jluo2023 |
− | :-Evaluating CEBAF unipolar magnets w/ reversal | + | : - Sep 24 – 29 - Joe, 'A positron beam at CEBAF” @ SPIN'2023 - https://indico.jlab.org/event/663/ |
− | :-Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams | + | |
− | :-Evaluation of radiation shielding for >100 kW target | + | ;Reports |
− | :-Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams | + | : -Andriy - CST benchmarking |
− | :-[[media:JLab AAC Report March 8-10 2023 Final.pdf]] | + | : -Sohaib - target stress simulations |
+ | : -Amy - degrader LDRD plan | ||
+ | |||
+ | ;Status of proposals | ||
+ | : - HEP proposal for e-/e+ sources development, with SLAC and KEK | ||
+ | : - DOE early career proposal for low vacuum (high current sources) | ||
+ | : - UVA JSA proposal to evaluate spin rotator for higher MeV energies | ||
+ | : - LDRD award (2nd year) to study phase acceptance of CEBAF | ||
+ | : - LDRD proposal (1st year) to study thermal predictions and stresses | ||
+ | : - DOE SBIR awarded to Xelera/JLab for liquid jet target Phase I study | ||
+ | |||
+ | ;2023 topics | ||
+ | : - Delivering 60-120 MeV e- or e+ from LERF to CEBAF | ||
+ | : - Quads with large bore and large range 60-600 MeV | ||
+ | : - Reversing polarity of magnets w/ bulk PS | ||
+ | : -Evaluating CEBAF unipolar magnets w/ reversal | ||
+ | : -Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams | ||
+ | : -Evaluation of radiation shielding for >100 kW target | ||
+ | : -Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams | ||
+ | : -[[media:JLab AAC Report March 8-10 2023 Final.pdf]] |
Latest revision as of 17:10, 6 June 2023
Meeting Coordinates
- Wednesdays @ 11am EDT
- -On-site TL-2236
- - Zoom (see e-mail)
Agenda
- Upcoming meetings...
- - June 14 (10:30-Noon), PWG joint meeting - https://indico.jlab.org/event/719/
- - June 28 (11am) Joe Gubeli, Gallium target at LERF, Ce+BAF weekly meeting
- - June 28 (2-4pm) - Joe or Yves, 'Positron Source and Beam' @ JLUO (15m) - https://www.jlab.org/jluo2023
- - Sep 24 – 29 - Joe, 'A positron beam at CEBAF” @ SPIN'2023 - https://indico.jlab.org/event/663/
- Reports
- -Andriy - CST benchmarking
- -Sohaib - target stress simulations
- -Amy - degrader LDRD plan
- Status of proposals
- - HEP proposal for e-/e+ sources development, with SLAC and KEK
- - DOE early career proposal for low vacuum (high current sources)
- - UVA JSA proposal to evaluate spin rotator for higher MeV energies
- - LDRD award (2nd year) to study phase acceptance of CEBAF
- - LDRD proposal (1st year) to study thermal predictions and stresses
- - DOE SBIR awarded to Xelera/JLab for liquid jet target Phase I study
- 2023 topics
- - Delivering 60-120 MeV e- or e+ from LERF to CEBAF
- - Quads with large bore and large range 60-600 MeV
- - Reversing polarity of magnets w/ bulk PS
- -Evaluating CEBAF unipolar magnets w/ reversal
- -Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams
- -Evaluation of radiation shielding for >100 kW target
- -Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams
- -media:JLab AAC Report March 8-10 2023 Final.pdf