Difference between revisions of "PPB - July 26, 2023"
Jump to navigation
Jump to search
(Created page with "===Meeting Coordinates=== ;Wednesdays @ 11am EDT : - On-site TL-2236 : - Zoom (see e-mail) ==Agenda== : Sohaib - trial presentation of REU final presentation at ODU on Fri,...") |
(→Agenda) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
==Agenda== | ==Agenda== | ||
− | + | * Sohaib - trial presentation of REU final presentation at ODU on Fri, July 28 | |
− | + | * Andriy - update on e+ beam tracking in 1st capture solenoid - [[media:Ushakov-CaptureSolenoid-Ce+BAF-Meeting-20230726-v2.pptx]] | |
− | + | * All - round table updates | |
==Meetings== | ==Meetings== |
Latest revision as of 08:44, 27 July 2023
Meeting Coordinates
- Wednesdays @ 11am EDT
- - On-site TL-2236
- - Zoom (see e-mail)
Agenda
- Sohaib - trial presentation of REU final presentation at ODU on Fri, July 28
- Andriy - update on e+ beam tracking in 1st capture solenoid - media:Ushakov-CaptureSolenoid-Ce+BAF-Meeting-20230726-v2.pptx
- All - round table updates
Meetings
- - July 24-28 - 51st Program Advisory Committee (PAC 51) - https://indico.jlab.org/event/723/
Running lists
- Status of proposals
- - HEP proposal for e-/e+ sources development, with SLAC and KEK => awarded year 1
- - DOE early career proposal for low vacuum (high current sources) => pending
- - UVA JSA proposal to evaluate spin rotator for higher MeV energies => pending
- - LDRD award (2nd year) to study phase acceptance of CEBAF => awarded year 1, pending year 2
- - LDRD proposal (1st year) to study thermal predictions and stresses => pending year 1
- - DOE SBIR awarded to Xelera/JLab for liquid jet target Phase I study => awarded
- 2023 topics
- - Delivering 60-120 MeV e- or e+ from LERF to CEBAF
- - Quads with large bore and large range 60-600 MeV
- - Reversing polarity of magnets w/ bulk PS
- - Evaluating CEBAF unipolar magnets w/ reversal
- - Strategic roadmap for diagnostics for tuning and transporting secondary e+/e- beams
- - Evaluation of radiation shielding for >100 kW target
- - Strategic roadmap for LERF cryomodules and energy reach of primary e- and secondary e+/e- beams
- - media:JLab AAC Report March 8-10 2023 Final.pdf