Difference between revisions of "MOLLER PQB Meeting January 17, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with " 1- Updated firmware of helicity generator board to have MOLLER settings on December 20th, 2023. Took parity DAQ runs with every pattern to confirm pattern sequence. 2- Initi...")
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
In person in MCC Conference Room and with Zoom.
  
1- Updated firmware of helicity generator board to have MOLLER settings on December 20th, 2023. Took parity DAQ runs with every pattern to confirm pattern sequence.
+
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
  
2- Initial data to study correlation with K-Long charge asymmetry - analysis underway. Need to do SCL measurements with Hall D laser.
+
--
  
3- BCM Receiver tests update on (Devi Adhikari): [[media:Cavity_BCM_Study_10Jan2024.pdf]]
+
'''Agenda:'''
 +
 
 +
1- Took parity DAQ runs with every pattern to confirm pattern sequence. Checked patterns and delays with beam. Analysis underway
 +
 
 +
2- Initial data to study correlation with K-Long charge asymmetry - Repeat with more statistics. Need to do SCL measurements with Hall D laser.
 +
 
 +
3- BCM Receiver tests update

Latest revision as of 10:25, 19 January 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

1- Took parity DAQ runs with every pattern to confirm pattern sequence. Checked patterns and delays with beam. Analysis underway

2- Initial data to study correlation with K-Long charge asymmetry - Repeat with more statistics. Need to do SCL measurements with Hall D laser.

3- BCM Receiver tests update