Difference between revisions of "MOLLER PQB Meeting May 1, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' # ''' FFB Test Results and BCM Resolution Stu...")
 
 
(4 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
'''Agenda:'''  
 
'''Agenda:'''  
  
# ''' FFB Test Results and BCM Resolution Study'''
+
# '''Feed Forward Status'''
# ''' Feed Forward Status'''
 
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 8)  
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 8)  
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261]
 
## BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [https://tasklists.jlab.org/bslist/tasks/111261]
Line 15: Line 14:
 
### 4-channel BPMs saturation
 
### 4-channel BPMs saturation
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 +
# ''' May 19th is Machine Development Day''': high current push to Hall A (we can take parasitic data)

Latest revision as of 15:52, 1 May 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  1. Feed Forward Status
  2. K-Long Beam Loading: (tentatively scheduled on May 8)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [1]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [2]
    3. Other issues to look for:
      1. 4-channel BPMs saturation
      2. Dumping beam harmonics right onto one of the higher order mode frequencies
  3. May 19th is Machine Development Day: high current push to Hall A (we can take parasitic data)