Difference between revisions of "MOLLER PQB Meeting May 1, 2024"

From Ciswikidb
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 7: Line 7:
 
'''Agenda:'''  
 
'''Agenda:'''  
  
# '''FFB Test and BCM Resolution Results'''
 
 
# '''Feed Forward Status'''
 
# '''Feed Forward Status'''
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 8)  
 
# '''K-Long Beam Loading:''' (tentatively scheduled on May 8)  
Line 15: Line 14:
 
### 4-channel BPMs saturation
 
### 4-channel BPMs saturation
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 
### Dumping beam harmonics right onto one of the higher order mode frequencies
 +
# ''' May 19th is Machine Development Day''': high current push to Hall A (we can take parasitic data)

Latest revision as of 15:52, 1 May 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--

Agenda:

  1. Feed Forward Status
  2. K-Long Beam Loading: (tentatively scheduled on May 8)
    1. BSList to deliver 15.6 MHz beam from Hall D laser to Hall C - Riad Suleiman: [1]
    2. BSList to measure PQB beam in Injector and Hall A - Caryn Palatchi: [2]
    3. Other issues to look for:
      1. 4-channel BPMs saturation
      2. Dumping beam harmonics right onto one of the higher order mode frequencies
  3. May 19th is Machine Development Day: high current push to Hall A (we can take parasitic data)