Difference between revisions of "MOLLER PQB Meeting September 11, 2024"
Jump to navigation
Jump to search
(3 intermediate revisions by the same user not shown) | |||
Line 12: | Line 12: | ||
# Beam tests showed excellent beam quality and good transmission at 100 μA: [https://logbooks.jlab.org/entry/4315868 ELOG #4315868] | # Beam tests showed excellent beam quality and good transmission at 100 μA: [https://logbooks.jlab.org/entry/4315868 ELOG #4315868] | ||
− | # RTP new HV Driver full system testing | + | # RTP new HV Driver full system is finally ready - to start bench testing today |
* '''Beam Study Results:''' | * '''Beam Study Results:''' | ||
− | # FFB/FF in Hall A: | + | # FFB/FF in Hall A: Ryan will prepare a plan |
Latest revision as of 13:58, 11 September 2024
In person in MCC Conference Room and with Zoom.
https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam
--
Agenda:
- Injector Upgrade Progress:
- Beam tests showed excellent beam quality and good transmission at 100 μA: ELOG #4315868
- RTP new HV Driver full system is finally ready - to start bench testing today
- Beam Study Results:
- FFB/FF in Hall A: Ryan will prepare a plan