Difference between revisions of "MOLLER PQB Meeting November 6, 2024"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "In person in MCC Conference Room and with Zoom. https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam -- '''Agenda:''' * JLAB Prototype HV Driver: ## RTP Driver Pr...")
 
 
(2 intermediate revisions by the same user not shown)
Line 10: Line 10:
  
 
* JLAB Prototype HV Driver:
 
* JLAB Prototype HV Driver:
## RTP Driver Prototype Crosstalk tests - Jim Kortze: [[media:RTP_prototype_Crosstalk_tests.pdf]]  [[media:RTP_prototype_Crosstalk_tests.pptx]]
+
# RTP Driver Prototype Crosstalk tests - Jim Kortze: [[media:RTP_prototype_Crosstalk_tests_part2.pdf]]  [[media:RTP_prototype_Crosstalk_tests_part2.pptx]]
## Installation Schedule: [[media:RTP_Installation_Schedule.pdf]]
+
# Installation Schedule: [[media:RTP_Installation_Schedule.pdf]]
  
  
 
* '''Injector beam commissioning and studies start Nov 25'''
 
* '''Injector beam commissioning and studies start Nov 25'''

Latest revision as of 09:08, 12 November 2024

In person in MCC Conference Room and with Zoom.

https://wiki.jlab.org/ciswiki/index.php/Parity_Quality_Beam

--


Agenda:


  • JLAB Prototype HV Driver:
  1. RTP Driver Prototype Crosstalk tests - Jim Kortze: media:RTP_prototype_Crosstalk_tests_part2.pdf media:RTP_prototype_Crosstalk_tests_part2.pptx
  2. Installation Schedule: media:RTP_Installation_Schedule.pdf


  • Injector beam commissioning and studies start Nov 25