Difference between revisions of "August 10, 2015 - CEBAF/LERF"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "There are a diverse set of tasks and beam related tests we're aiming to do at both the CEBAF and LERF injectors over the next 3 months. I reserved TL-1227 next Monday August ...")
 
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
There are a diverse set of tasks and beam related tests we're aiming to do at both the CEBAF and LERF injectors over the next 3 months.  I reserved TL-1227 next Monday August 10 @ 1:30pm to share and discuss these.  How about we go around the room hearing a ~brief update/plan on the topics listed below.  Please come prepared with or upload to wiki link below any information that helps convey details, plans, beam requirements, time, etc. etc.
 
There are a diverse set of tasks and beam related tests we're aiming to do at both the CEBAF and LERF injectors over the next 3 months.  I reserved TL-1227 next Monday August 10 @ 1:30pm to share and discuss these.  How about we go around the room hearing a ~brief update/plan on the topics listed below.  Please come prepared with or upload to wiki link below any information that helps convey details, plans, beam requirements, time, etc. etc.
 +
 +
* Schedule and tasks [[media:150810_INJ.xlsx]]
 +
  
 
1. Joe/John - Status of CEBAF 4-laser upgrade, commissioning plans and Fall program
 
1. Joe/John - Status of CEBAF 4-laser upgrade, commissioning plans and Fall program
2. Bubba/Carlos/Shukui - Plans for recovering gun/photocathode + laser @ LERF
+
 
3. Riad - Requirements and plans for Bubble commissioning run @ CEBAF
+
2. Riad - Requirements and plans for Bubble commissioning run @ CEBAF
4. George/Pavel - Status, requirements, plans for gallium radio-isotope test @ CEBAF
+
 
5. Alicia/Reza/Yan - Injector group beam study plans
+
3. Alicia/Reza/Yan - Injector group beam study plans
 +
 
 +
4. Bubba/Carlos/Shukui - Plans for recovering gun/photocathode + laser @ LERF
 +
 
 +
5. Fay/Mahmoud/Matt/Joe - Brock cavity measurements (bunch length, phase monitoring, ?)
 +
 
 
6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode
 
6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode
7. Fay/Mahmoud/Matt/Joe - Brock cavity measurements (bunch length, phase monitoring, ?)
+
 
8. What/who else am I forgetting?
+
7. George/Pavel - Status, requirements, plans for gallium radio-isotope test @ CEBAF
 +
 
 +
8. Joe - Mott Run II
 +
 
 +
9. What/who else am I forgetting?

Latest revision as of 12:30, 10 August 2015

There are a diverse set of tasks and beam related tests we're aiming to do at both the CEBAF and LERF injectors over the next 3 months. I reserved TL-1227 next Monday August 10 @ 1:30pm to share and discuss these. How about we go around the room hearing a ~brief update/plan on the topics listed below. Please come prepared with or upload to wiki link below any information that helps convey details, plans, beam requirements, time, etc. etc.


1. Joe/John - Status of CEBAF 4-laser upgrade, commissioning plans and Fall program

2. Riad - Requirements and plans for Bubble commissioning run @ CEBAF

3. Alicia/Reza/Yan - Injector group beam study plans

4. Bubba/Carlos/Shukui - Plans for recovering gun/photocathode + laser @ LERF

5. Fay/Mahmoud/Matt/Joe - Brock cavity measurements (bunch length, phase monitoring, ?)

6. Marcy/Shukui/Joe - Characterization tests of GaAs/GaAsP, DBR, Sb-cathode

7. George/Pavel - Status, requirements, plans for gallium radio-isotope test @ CEBAF

8. Joe - Mott Run II

9. What/who else am I forgetting?