* Some thoughts about the reasons for "QE drops and associated cathode damage spots while running 1 mA DC, 300keV beam"
 
* Some thoughts about the reasons for "QE drops and associated cathode damage spots while running 1 mA DC, 300keV beam"
 +
** Why we were not able to run > 1 mA in the GTS while Russel and Riad could run 20 mA in the Test Cave?
 +
** [[File:Slide3.jpg]]
 
** This is Carlos' ERL09 presentation about similar observations while running high current in the FEL gun: [[Media:FEL-Photocathode-'arcing'-ERL09.pdf]]
 
** This is Carlos' ERL09 presentation about similar observations while running high current in the FEL gun: [[Media:FEL-Photocathode-'arcing'-ERL09.pdf]]
 
**  [https://logbooks.jlab.org/entry/3421187 And this is a link to the GTSLOG with data from July 14th 2016 run]
 
**  [https://logbooks.jlab.org/entry/3421187 And this is a link to the GTSLOG with data from July 14th 2016 run]

Revision as of 06:24, 20 September 2016

  • Cathode Prep Chamber
    • Mamun and Yan successfully demonstrated that the heat-puck engagement mechanism works.
    • A spring with 5 leaves was made by the machine shop. Mamun found out that the height of the bend was too much, so he 'flattened' it bit, making the puck easier to insert and remove.
    • Measured force to disengage puck: about 3 lbs.
    • Also found that the length of the leaves has to be shorter, Mamun had to add a second 'hose clamp'
    • Testing under vacuum, found that several heat-cool cycles kept the puck engaged, but after removal form vacuum springs seemed to be more stiff. Mammon thinks it is because the test temp was as high as 300C, which we do not need. Usual photocathode activation is 150-200 C.
    • Mamun is setting up for a temperature calibration using a TC in vacuum.
  • HV Gun chamber
    • Did a test fit for the NEGs using the rails and the perforated plate, see picture below.
    • NEG perforated plate mockup front view.jpg
    • The gap between the NEG and the perforated plate is about 1 cm.
    • The rails have been tack welded to the chamber
    • Next is assembling the NEG package inside the gun.
  • Magnetized beam
    • Update from Riad.