+ | * Beamline Drawings: | ||
+ | :[[file:GTS_Beamline_11-8-16_Front_View.jpg]] | ||
+ | :[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]] | ||
+ | |||
+ | |||
+ | * New Beamline Magnets: | ||
+ | # Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total) | ||
+ | |||
+ | |||
* EES support at GTS: | * EES support at GTS: | ||
# SCAM module installation | # SCAM module installation | ||
# Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty) | # Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty) | ||
# Instrument Faraday Cup | # Instrument Faraday Cup | ||
− | |||
− | |||
− | |||
− | |||
Revision as of 09:41, 8 November 2016
- Beamline Drawings:
- New Beamline Magnets:
- Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
- EES support at GTS:
- SCAM module installation
- Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty)
- Instrument Faraday Cup
- Procurement:
- Two radiabeam steerers
- Steerers mounts
- What else?