Difference between revisions of "GTS meeting 11 08 16"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
* Beamline Drawings: | * Beamline Drawings: | ||
:[[file:GTS_Beamline_11-8-16_Front_View.jpg]] | :[[file:GTS_Beamline_11-8-16_Front_View.jpg]] | ||
+ | |||
+ | |||
:[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]] | :[[media:haysg_JL0038343-MAGNETIZED_BEAM_LDRD_ASSY.pdf]] | ||
Revision as of 09:43, 8 November 2016
- Beamline Drawings:
- New Beamline Magnets:
- Add two more solenoids (2 Amps) and five new radiabeam steerers (3 Amps) – power cables (12 in total)
- EES support at GTS:
- SCAM module installation
- Upgrade diagnostic crossings with 3-position controls (viewer, slit, empty)
- Instrument Faraday Cup
- Procurement:
- Two radiabeam steerers
- Steerers mounts
- What else?